Search results for: highway bridge removal

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 86
  • Sunset Highway Bridge Removal

    Type : Bid Notification

    Due : 13 Jul, 2022 (21 months ago)
    Posted : 21 months ago
    Started : 28 Jun, 2022 (22 months ago)

    Degerstrom, Inc. is seeking quotes from qualified DBE firms for this project, which consists removing an existing bridge over the N Fork of Deep Creek and restoring the channel. Potential work scopes include traffic control, demolition, barrier, fencing and landscaping. Plans are available at the Spokane County website or from N.A. Degerstrom and are also at local plan centers.

    From: Washington State Office of Minority and Women (State)

  • Clutesi Haven Marina Dredge

    Type : Bid Notification

    Due : 02 Jul, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 25 Jun, 2019 (about 4 years ago)

    Considerations: Should the project be completed from atop the bridge, Highway 4, highway closures, flaggers, foot bridge removal etc., will need to be considered. Should the project be completed water side by barge, floats in Clutesi Haven Marina will have to be removed and replaced. Deadline: July 2, 2019: 4:00pm Project to commence early July 2019.

    From: MerX (Federal)

  • Debris shielding & netting

    Type : Bid Notification

    Due : 07 Dec, 2017 (about 6 years ago)
    Posted : about 6 years ago
    Started : 20 Nov, 2017 (about 6 years ago)

    -removal of existing bridge structure-flaggers-maintenance of traffic-portable changeable message sign-debris netting-mobilization-repairs or replacements as needed-bridge structures Bid Related Documents Download Document Bid Related Attachments Download Attachment Amendments Download Amendment Product Codes: 96884, 91366 Agency Information Issuing Agency: State of New Hampshire - Department of Transportation State: New Hampshire Agency Type: State

    From: New Hampshire (State)

  • CON0017546, 38:10, BF 74233, Carrying Hwy. 38 over North Saskatchewan River, 13 km SE of Redwater

    Type : Bid Notification

    Due : 10 May, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 12 Mar, 2019 (about 5 years ago)

    38 over North Saskatchewan River, 13 km SE of Redwater 38:10, C1 km 17.300 and km 22.680 830:04, C1 km 11.330 and km 12.538 Planning, Preliminary Engineering, Detailed Design, Utility Coordination, Public Consultation, Right-of-Way Acquisition, Contract Tendering, Construction Supervision, Contract Administration, Material Fabrication Inspection, Post Construction and Warranty Inspection Services for Bridge Replacement, Bridge Removal, Highway Alignment

    From: MerX (Federal)

  • FY26 Duckabush Estuary Restoration

    Type : Bid Notification

    Due : 30 May, 2024 (in 28 days)
    Posted : 23 hours ago
    Started : 30 Apr, 2024 (1 day ago)

    The project includes construction of an elevated roadway on a 1,614-foot long 34-foot-wide bridge upstream from the existing U.S. Highway 101. Three undersized culverts will be replaced with fish-passable structures. The new bridge will have a new Duckabush Road intersection with a left turn pocket onto Duckabush Road. The project also includes removal of 1,700 feet of the U.S.

    From: Federal Government (Federal)

  • 24-006 Concrete Removal and Replacement 2024-A

    Type : Bid Notification

    Due : 23 Jan, 2024 (3 months ago)
    Posted : 4 months ago
    Started : 14 Dec, 2023 (4 months ago)

    Bid Number:IFB 24-006 Bid Title:24-006 Concrete Removal and Replacement 2024-A Category:SCCMO Highway/Road and Bridge ProjectsStatus:Open Publication Date/Time: 12/14/2023 7:00 AM Closing Date/Time: 1/23/2024 10:00 AM Related Documents: 24-006 Concrete Removal and Replacement 2024-A Return To Main Bid Postings Page

    From: St. Charles (County)

  • Lions Trail Reconstruction - Newcastle

    Type : Bid Notification

    Due : 03 May, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 19 Apr, 2022 (about 2 years ago)

    The scope of works includes: • Reconstruction of Lions Trail from approximately 50m north of Sunset Boulevard to King Avenue West (Regional Highway 2) including existing trail asphalt and pedestrian bridge structure removal, clearing / grubbing, earthworks, culvert removal and replacement, replacement of trail base and asphalt paving, installation of a pedestrian crossover at the Edward Street crossing, and general boulevard and area restoration.

    From: Ontario Public Buyers Association (Co-op)