Type : Bid Notification
The DEPARTMENT requires a Bridge (NBI)/ Tunnel Inspection Inventory (NTI) software solution to allow Bridge and Tunnel Inspection staff and its consultants to meet federal requirements.
The DEPARTMENT requires a Bridge (NBI)/ Tunnel Inspection Inventory (NTI) software solution to allow Bridge and Tunnel Inspection staff and its consultants to meet federal requirements.
2024 Tunnel Lighting LED Upgrade2024 Tunnel Lighting LED Upgrade Construction Bid Notice MSP Airport May 14, 2024 View
Army Engineer Research and Development Center (ERDC), Cold Regions Research and Engineering Laboratory (CRREL), Biogeochemical Sciences Branch (BSB) requires the procurement of two enclosed high tunnels greenhouses for current and incoming project work. Greenhouses will be utilized to create a controlled growing area over containment test cells.
Le ministère des Transports et de la Mobilité durable, requiert, par le présent appel d'offres, des soumissions dans le but d'octroyer un contrat ferme pour l'acquisition d'accessoires de relampage pour le Tunnel Ville-Marie, le tout, selon le devis, la norme et les spécifications faisant partie des documents d'appel d'offres. Les documents d'appel d'offres sont disponibles uniquement par le système électronique SEAO.
***This Combined Synopsis/Solicitation (CSS) is being issued to establish a Fixed Price contract for the purchase of plastic tunnel bags, fiberboard boxes, and fiberboard flutes at DLA Distribution San Joaquin, CA. See SP3300-24-Q-0130 for more details. Please complete Attachment 1-Schedule of Services and Attachment 2-Drawing_Diagram for all quotes submitted. This is an 'all or nothing' requirement where all line items must be quoted.
PUBLIC IMPROVEMENT REQUEST FOR PROPOSAL RFP# 24-23 Barton/Bandemer Park Pedestrian Tunnel Project City of Ann Arbor PARKS AND RECREATION SERVICES/COMMUNITY SERVICES AREA Due Date: May 8, 2024 by 11:00a.m.(local time) Issued By: City of Ann Arbor Procurement Unit 301 E.
Swim Tunnel respirometry allows researchers to effect water quality changes in a controlled environment and measure changes to an organism’s metabolic processes as a result.SCOPE: The Contractor shall furnish and deliver the swim tunnel, sensors, probes, and peripherals listed in Statement of Need.