Type : Bid Notification
The project consists of: Schedule II – Rehabilitate approximately 190-LF of existing 72-Inch Diameter CSP culvert in the Holling Drain crossing Barrett Road just west of W. Echo Drive by lining with 63-Inch O.D. HDPE slip-line pipe. Miscellaneous work associated with this schedule includes bypass pumping of the Holling Drain, installing riprap and geotextile, and ditch and landscape restoration.