Search results for: horizontal borehole

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 7 of 7
  • PURCHASE HORIZONTAL BOREHOLE DRILLING FOR THE ROCK

    Type : Bid Notification

    Due : 06 Dec, 2022 (17 months ago)
    Posted : 17 months ago
    Started : 05 Dec, 2022 (17 months ago)

    Description PURCHASE HORIZONTAL BOREHOLE DRILLING FOR THE ROCKY MOUNTAIN REGION LOCATED IN GUERNSEY WYOMING Overview Reference number: 89503223QWA000471 Issue date: 12/05/2022 Response due: 12/06/2022 04:00 PM US/Eastern Set Aside: Total Small Business Set-Aside (FAR 19.5) NAICS: 237990 PSC / FSC: Z2LC-REPAIR OR ALTERATION OF TUNNELS AND SUBSURFACE STR Agency: DOE Contracting office: Western Rocky Mountain Region WAPA (RMR) US DOE/Western Area Power

    From: FedConnect (Federal)

  • Z--Horizontal Borehole Drilling Services

    Type : Bid Notification

    Due : 06 Dec, 2022 (17 months ago)
    Posted : 17 months ago
    Started : 30 Nov, 2022 (17 months ago)

    The work includes but is not limited to: Drilling a Borehole at Western’s, RMR, Guernsey Substation. FAR Part 12, Acquisition of Commercial Items, in conjunction with FAR Part 13, Simplified Acquisition Procedures is being utilized for this requirement. The solicitation is issued as a 100% Small Business Set-Aside. The applicable NAICS Code is 237990; Size Standard is $39.5 Million.

    From: Federal Government (Federal)

  • Customs and Border Protection

    Type : Bid Notification

    Due : 28 Jun, 2017 (about 6 years ago)
    Posted : about 6 years ago
    Started : 21 Jun, 2017 (about 6 years ago)

    The SUBCONTRACTOR shall provide advanced engineering and technical knowledge and skills, including subject matter expertise in the area of boder security threat detection capabilities (primarily tunneling threat); knowledge required to advise in the construction of horizontal and vertical boreholes that will be used for technology evaluations; provide engineering advisory support needed for the characterization of the geology from borehole cuttings

    From: Federal Government (Federal)

  • BELDING WATER WELL #6 REPLACEMENT

    Type : Bid Notification

    Due : 07 Mar, 2024 (1 month ago)
    Posted : 11 months ago
    Started : 11 Dec, 2023 (4 months ago)

    The maximum allowable horizontal deviation (drift) of the borehole from the vertical shall not exceed 0.5°. Under no circumstances shall borehole deviation prevent construction and use of the supply well described in these specifications.

    From: Fort Stockton (City)