Search results for: hot bonding tech rep

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 8 of 8
  • HOT BONDING TECH REP

    Type : Bid Notification

    Due : 07 Nov, 2022 (18 months ago)
    Posted : 18 months ago
    Started : 01 Nov, 2022 (18 months ago)

    All emailed quotes shall have 70Z04023Q60311Y00 in the subject of the email.The United States Coast Guard Surface Forces Logistics Center has a requirement for the following items:ITEM 1: HOT BONDING / SEAL ASSEMBLYTECH REP TO HOT BOND INFLATABLE SEAL ANDASSEMBLE SEALS FOR THE CGC DANIEL, TARR HERE AT THE YARD INBALTIMORE MD OR OR ABOUT 12/01/22QUANTITY: 01 JOB*DELIVERY PRICE (IF ANY) SHALL BE INCLUDE IN THE QUOTEVENDOR MUST BE CAPABLE OF STARTING

    From: Federal Government (Federal)

  • Seal Assembly and Hot Bonding on CGC Joseph Doyle

    Type : Bid Notification

    Due : 16 Mar, 2023 (13 months ago)
    Posted : 14 months ago
    Started : 01 Mar, 2023 (14 months ago)

    OF SHAFT SEALDESCRIPTION: HOT BONDING / SEAL ASSEMBLY TECH REP TO HOT BOND INFLATABLE SEAL AND ASSEMBLE SEALS FOR THE CGC JOSEPH DOYLE HERE AT THE YARD IN BALTIMORE MD ON OR ABOUT 4/1/23Line Total:Estimated Performance Date:*Services are Required by 4/1/2023*Place of Performance: U.S.

    From: Federal Government (Federal)

  • Construct Okaloosa County Water and Sewer Field Offices

    Type : Bid Notification

    Due : 09 Dec, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 24 Nov, 2020 (about 3 years ago)

    Bonding Straps and Jumpers: Install in locations accessible for inspection and maintenance, except where routed through short lengths of conduit. 1. Bonding to Structure: Bond straps directly to basic structure, taking care not to penetrate any adjacent parts. 2. Bonding to Equipment Mounted on Vibration Isolation Hangers and Supports: Install so vibration is not transmitted to rigidly mounted equipment. 3.

    From: Okaloosa (County)

  • 300171 – UPDC WALR Fiscal 2020

    Type : Bid Notification

    Due : 18 Aug, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 17 Jul, 2020 (about 3 years ago)

    Wethersfield, CT 06109 Date Issued: ___________________________ CONNECTICUT DEPARTMENT OF LABOR WAGE AND WORKPLACE STANDARDS DIVISION CONTRACTORS WAGE CERTIFICATION FORM Construction Manager at Risk/General Contractor/Prime Contractor I, of Officer, Owner, Authorized Rep.

    From: University of Connecticut (Higher Education)

  • 300171 UPDC WALR Fiscal 2020 Phase 2

    Type : Bid Notification

    Due : 14 Oct, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 23 Sep, 2020 (about 3 years ago)

    Appendix E Drawings.pdf Sheets and Views A000 A001 A100 A101 A102 A103 A104 A200 A201 19.372 UCONN Multiple IT Rooms PHASE 2 MEP SET Issued for Bid.pdf.pdf ME001 ME002 ME100 ME101 ME102 ME103 ME104 ME201 ME301 Authorized Rep: Contracting Agency: Agency Address: Project Name/Number: Project Address: Project Amount: Contractor Name: Contractor Address: Contractor Rep: Start Date: Complete Date: Signature Date: Owner/Officer: Company Name: Company Name2

    From: University of Connecticut (Higher Education)