Type : Bid Notification
.• Seismic and structural stabilization of the Hotel that requires construction of shear walls, moment frames, and other seismic bracing.• Reconfiguration of many rooms to facilitate the installation of new bathrooms flooring and room finishes.• Complete replacement of the original electrical system including the distribution system, light fixtures, and emergency lighting.• Replacement of all existing domestic water and waste water piping and systems