Search results for: hotel seismic

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 10
  • Mammoth Hotel Seismic Stabilization Phase 2

    Type : Bid Notification

    Due : 07 Jul, 2017 (about 6 years ago)
    Posted : about 6 years ago
    Started : 19 Jun, 2017 (about 6 years ago)

    .• Seismic and structural stabilization of the Hotel that requires construction of shear walls, moment frames, and other seismic bracing.• Reconfiguration of many rooms to facilitate the installation of new bathrooms flooring and room finishes.• Complete replacement of the original electrical system including the distribution system, light fixtures, and emergency lighting.• Replacement of all existing domestic water and waste water piping and systems

    From: Federal Government (Federal)

  • Mammoth Hotel Seismic Stabilization Phase 1

    Type : Bid Notification

    Due : N/A
    Posted : about 7 years ago
    Started : 13 Jun, 2016 (about 7 years ago)

    As winter wolf viewing has become more popular with the public, this facility has seen a corresponding increase in winter use.The Mammoth Hotel Rehabilitation involves the structural and seismic stabilization of the Lobby, Porte Cochre, and Map Room areas of the historic, 90 year old Mammoth Hot Springs Hotel.

    From: Federal Government (Federal)

  • Correct Critical Safety Hazards and Rehabilitate t

    Type : Bid Notification

    Due : 13 May, 2022 (23 months ago)
    Posted : about 2 years ago
    Started : 31 Mar, 2022 (about 2 years ago)

    Correct Critical Safety Hazards and Rehabilitate the Ahwahnee Hotel NHL-Seismic Strengthening YOSE 154910B

    From: Federal Government (Federal)

  • Seismic Stabilization and Rehabilitation of Mammoth Hotel Phase II

    Type : Bid Notification

    Due : 09 May, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 04 May, 2018 (about 6 years ago)

    .• Seismic and structural stabilization of the Hotel that requires construction of shear walls, moment frames, and other seismic bracing.• Reconfiguration of many rooms to facilitate the installation of new bathrooms flooring and room finishes.• Complete replacement of the original electrical system including the distribution system, light fixtures, and emergency lighting.• Replacement of all existing domestic water and waste water piping and systems

    From: Federal Government (Federal)

  • Seismic Stabilization and Rehabilitation of Mammoth Hotel Phase II

    Type : Award

    Due : N/A
    Posted : about 5 years ago
    Started : 10 Jul, 2018 (about 5 years ago)

    Contact Information: Frank Camacho, Contracting Officer, Phone (303) 969-2344, Email frank_camacho@nps.gov - Sarah Clemmens, Contract Specialist, Phone 303-969-2228, Email sarah_clemmens@nps.gov Office Address :12795 West Alameda ParkwayPost Office Box 25287 Denver CO 80225-0287 Location: NPS - All Offices Set Aside: Award Number: 140P2018C0038 Award Amount : $21,275,500.00 Award Date: 0710180001, 0003, and 0004 Awardee: Swank Enterprises, 615 Pondera Avenue, Valier, MT 59486 US

    From: Federal Government (Federal)

  • EXT GSA | 835 Turk St PSH Rehab

    Type : Bid Notification

    Due : 06 May, 2023 (11 months ago)
    Posted : 13 months ago
    Started : 27 Mar, 2023 (13 months ago)

    . ● Hydronic heating refurbishment ● Electrical refurbishment ● Remodel of existing community kitchen and addition of new one so that all residents may have facility to prepare meals ● Addition of air filtration per Health Code 38 ● Ventilation improvements ● Unit updates and upgrades ● Conversion of existing hotel commercial laundry to residential use ● Seismic strengthening ● Isolate elevator lobby and main stair for fire safety Now the Sponsor

    From: San Francisco (City)

  • EXT GSA | 835 Turk St PSH Rehab

    Type : Bid Notification

    Due : 23 May, 2023 (11 months ago)
    Posted : 12 months ago
    Started : 24 Apr, 2023 (12 months ago)

    . ● Hydronic heating refurbishment ● Electrical refurbishment ● Remodel of existing community kitchen and addition of new one so that all residents may have facility to prepare meals ● Addition of air filtration per Health Code 38 ● Ventilation improvements ● Unit updates and upgrades ● Conversion of existing hotel commercial laundry to residential use ● Seismic strengthening ● Isolate elevator lobby and main stair for fire safety The renovation scope

    From: San Francisco (City)