Type : Bid Notification
Over the course of one year, MUSD may spend approximately $75,000 to $100,000 on HVAC filters.
Over the course of one year, MUSD may spend approximately $75,000 to $100,000 on HVAC filters.
-38 IFB HVAC Lab Ventilation Renovations_Central South Campus.pdf431.92 KB
URL: Addendum: Class/Item Code(s): 91062-Protection Of Building From Weather Or Vandalism 91438-Electrical 91450-Heating, Ventilating And Air Conditioning (Hvac) 97537-Garbage/Refuse Equipment (Dumpsters, Etc.) Rental Or Lease 91430-Concrete Attachments#NameDescription1ESBD_File_354378_010 IFB - LQB_Vertical_Alternates_10.1.23.pdfFrank Garrett HVAC
The International Terminal HVAC system consists of air handling units (AHUs) which are past their useful life expectancy. Replacing these components will improve smoke control compliance, reduce energy usage, and improve resilience. The base bid includes the replacement of AHU components in ITB Level 2 and 3, BAA, and BAG.
The International Terminal HVAC system consists of air handling units (AHUs) which are past their useful life expectancy. Replacing these components will improve smoke control compliance, reduce energy usage, and improve resilience. The base bid includes the replacement of AHU components in ITB Level 2 and 3, BAA, and BAG.
In support of the United States Air Force (USAF) and Federal Aviation Administration (FAA), the Volpe Center requires construction services to replace the inoperable rooftop heating, ventilation, and air conditioning (HVAC) unit.
Request for Bids RFB Number: 2024-0502-01-008 Doyle Elementary School Gymnasium HVAC Improvements 1 White County, Tennessee Page 4 of 4 II. Advertisement for RFB White County, Tennessee Request for Bids RFB No. 2024-0502-01-008 Take notice that the Director of Finance for White County shall accept sealed written bids for upgrades to the Doyle Elementary School gymnasium HVAC system.