Type : Bid Notification
04/08/2024: See the attached solicitation and specifications in the Attachments/Links section.
04/08/2024: See the attached solicitation and specifications in the Attachments/Links section.
The contractor will provide 4-bushings to be further machined at Illinois Waterway Project. The bushings will be utilized during 2023 lock closures and are replacements for worn bushings that are part of the miter gate system of inland waterway lock opening and closing operations.
Janitorial/cleaning services for the Illinois Waterway Visitor Center.
Illinois Waterway Miter Gate Gearboxes Supply
Extend Closing date to 19 September 2017, 2:00PM CT
Description of work: The work includes, but not limited to, fabrication and delivery of Miter Gate Machinery components (gearbox, brake, motor, couplings) in support of the Rock Island District Operations group.NAICS: 332999Size Standard: 750 employeesEstimated Range: $5,000,000 - $10,000,000It is anticipated that the plans and specifications will be posted to sam.gov on or about 06 October 2021. Any contractor wanting the plans and specifications must download them from this site when posted.
The U.S. Army Corps of Engineers has a requirement for a New Trailer Dive Team. See Solicitation for additional information.Quotes are due on or before 26 September 2022 by 2PM Central Time.