Type : Bid Notification
RFP Regional Water System Improvements Water Transmission Main Package No. 7B Department:Regional Water System Start Date:2/13/2023 3:00 P.M. Close Date:3/31/2023 10:00 A.M.
RFP Regional Water System Improvements Water Transmission Main Package No. 7B Department:Regional Water System Start Date:2/13/2023 3:00 P.M. Close Date:3/31/2023 10:00 A.M.
Notice is hereby given by the Village of Oak Lawn, Illinois, that sealed Bids will be received for the following project: Regional Water System Improvements Water Transmission Main Bid Package No. 7B Phase III Construction Engineering Services The scope of services for the BP No. 7B Phase III Construction Engineering Services includes but is not limited to providing engineering services for the following: Design Services During Construction, Construction
The transmission water main work within the project area includes or may include various quantities of the following components: • Transmission water mains, valves, hydrants and other appurtenances. • Wastewater • Irrigation Quality • Electrical and SCADA • Storm Water improvement and treatment concepts, quantity attenuation, storage and runoff rate management and reduction • Roadway • Pathway/sidewalk • Landscaping • Ancillary repair and replacement
ITEM BID OPENINGIFB No. 450/038/23 April 20, 2023Phase 1 Water Transmission Main Improvements 11:00 AM Town of Andover, MA (Owner) invites sealed Bids for Phase 1 Water Transmission Main Improvements, DWSRF #6978 for installing cement lined ductile iron water mains on Argilla Road and Andover Street to replace existing cast iron water mains, valves, hydrants, and water services. Substantial Completion: 11/15/2023. Final Completion: 06/30/2024.
South St Water Transmission Main Improvements and Road Reconstruction Project