  • RFP Regional Water System Improvements Water Transmission Main Package No. 7B

    Type : Bid Notification

    Due : 31 Mar, 2023 (13 months ago)
    Posted : 14 months ago
    Started : 14 Feb, 2023 (14 months ago)

    RFP Regional Water System Improvements Water Transmission Main Package No. 7B Department:Regional Water System Start Date:2/13/2023 3:00 P.M. Close Date:3/31/2023 10:00 A.M.

    From: Oak Lawn (Village)

  • RFP RWS Improvements Water Transmission Main Bid Package No. 7B Phase III Construction Engineering Services

    Type : Bid Notification

    Due : 14 Apr, 2023 (12 months ago)
    Posted : 13 months ago
    Started : 06 Mar, 2023 (13 months ago)

    Notice is hereby given by the Village of Oak Lawn, Illinois, that sealed Bids will be received for the following project: Regional Water System Improvements Water Transmission Main Bid Package No. 7B Phase III Construction Engineering Services The scope of services for the BP No. 7B Phase III Construction Engineering Services includes but is not limited to providing engineering services for the following: Design Services During Construction, Construction

    From: Oak Lawn (Village)

  • RFP RWS Improvements Water Transmission Main Bid Package No. 7B Phase III Construction Engineering Services

    Type : Bid Notification

    Due : 14 Apr, 2023 (12 months ago)
    Posted : 13 months ago
    Started : 06 Mar, 2023 (13 months ago)

    See more details...

    From: Oak Lawn (Village)

  • Design Services for Transmission Water Main Improvements

    Type : Bid Notification

    Due : 17 Nov, 2023 (5 months ago)
    Posted : 5 months ago
    Started : 18 Oct, 2023 (6 months ago)

    The transmission water main work within the project area includes or may include various quantities of the following components: • Transmission water mains, valves, hydrants and other appurtenances. • Wastewater • Irrigation Quality • Electrical and SCADA • Storm Water improvement and treatment concepts, quantity attenuation, storage and runoff rate management and reduction • Roadway • Pathway/sidewalk • Landscaping • Ancillary repair and replacement

    From: Collier County (County)

  • South Street Water Transmission Main Improvements and Road Reconstruction

    Type : Bid Notification

    Due : 12 May, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 22 Apr, 2021 (about 3 years ago)

    South St Water Transmission Main Improvements and Road Reconstruction Project

    From: Massachusetts (State)

  • Phase 1 Water Transmission Main Improvements

    Type : Bid Notification

    Due : 20 Apr, 2023 (12 months ago)
    Posted : 13 months ago
    Started : 29 Mar, 2023 (13 months ago)

    ITEM BID OPENINGIFB No. 450/038/23 April 20, 2023Phase 1 Water Transmission Main Improvements 11:00 AM Town of Andover, MA (Owner) invites sealed Bids for Phase 1 Water Transmission Main Improvements, DWSRF #6978 for installing cement lined ductile iron water mains on Argilla Road and Andover Street to replace existing cast iron water mains, valves, hydrants, and water services. Substantial Completion: 11/15/2023. Final Completion: 06/30/2024.

    From: Andover (Town)

  • Water Transmission Main

    Type : Bid Notification

    Due : 26 Apr, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 23 Apr, 2019 (about 5 years ago)

    Notice is hereby given by the Village of Oak Lawn, Illinois, that sealed Bids will be received for the following project: Regional Water System Improvements Water Transmission Main Bid Package 6A The Work includes, but is not limited to the following: installation of approximately 5 miles of 60-inch water transmission main from just north of the Cal-Sag Channel to 151st Street within an existing ComEd utility corridor by open cut and by completing

    From: Oak Lawn (Village)