Type : Contract
Indian Trail Middle School Track Renovations Phase 2 (Revised) Postdate:- April 16, 2024 11 : 00 AM Responsedate:- May 02, 2024 2:00 PM solnum:- ITB 6763
Indian Trail Middle School Track Renovations Phase 2 (Revised) Postdate:- April 16, 2024 11 : 00 AM Responsedate:- May 02, 2024 2:00 PM solnum:- ITB 6763
competitive sealed bids from qualified contractors for the performance of the Indian Trail Stormwater Improvement Project (the “Project”), as more fully described in the Invitation for Bids.
Description: The City of Aurora, Illinois (City) is in need of professional services from a qualified engineering consultant for Phase III Construction Engineering Services for the Indian Trail Road Reconstruction project. As a part of the selection process, the interested consultants are required to submit a Statement of Qualifications (SOQ) to perform the requested work.
Loramie Creek Drive & Indian Trail Repaving Bids for the Loramie Creek Drive & Indian Trail Repaving project will be received by the Village of Fort Loramie at the Council Chambers, 14 Elm Street, Fort Loramie, Ohio 45845 , until Monday , March 25, 2024 at 10:00 a.m. local time. At that time the Bids received will be publicly opened and read.
For information regarding this Invitation to Bid, contact as follow: Adam McLamb Director of Public Works Town of Indian Trail 315 Matthews-Indian Trail Road, Indian Trail, NC 28079 Phone: 704-821-5401 Email: ajm@indiantrail.orgTo download your package, click the “Place Order” link above and choose the package. There is no charge to download.
Description: Name: Indian Trail West Water Main Replacement Location: Adobe Dr., Alameda Dr., Coral Ave., & Sapphire Ln. Proposed Improvement: Replacement of 3,100 feet of water main with 8” ductile iron pipe and other miscellaneous appurtenances all in accordance with the plans and specifications.
The project work will be conducted along portions of Sewell Lane, Indian Trail, Hunting Creek Court and Worthington Drive, as well as a segment of Church Street via open trench, open cut, and free bore installation methods. Project also includes the installation of valves, hydrants, and other miscellaneous water main appurtenances for the construction of a complete water system.