Type : Bid Notification
Water flow devices for “wet pipe systems”: Functional Inspection and Testing of water flow and pressure switches will include static testing only. No water will flow through the system. 4. Horn Tests: Sounding of horns must be conducted after 4:30 PM and prior to 9:30 PM. Personnel at each site must be noticed in advance of all horn and audio tests. All tests must be scheduled in advance with the School Principal or Site Administrator.