Type : Bid Notification
Then repeat on every third year following on all generators (including the two excluded from the first year). 5.Inspect relays and switches for integrity proper operation 6. Inspect LED Control board wiring and connections for proper operation. 7. Test automatic transfer switch and proper generator operation 8. Check battery charger for proper operation and no corrosion. 9. Check unit output voltage and adjust as necessary 10.