Search results for: install hvac bldg

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 279
  • 2300000506 RFB-203-23 WSH HVAC Removal & Install Bldg 15

    Type : Bid Notification

    Due : 02 Mar, 2023 (13 months ago)
    Posted : 14 months ago
    Started : 07 Feb, 2023 (14 months ago)

    New Search Solicitation: 2300000506 RFB-203-23 WSH HVAC Removal & Install Bldg 15 Issued: 2/7/23 Last Amended: Current Status: Open Start Date: Closing Date: Application Close Date: 3/2/23 2:00 PM ESTDoc Dept:Facilities & Support Services Time Left: 21 Days, 03:18:02 Buyer Name: Coordinator Name: Susan Ward Category:Construction Type:Request for Bids(RFB) Response Options Buyer Information Coordinator Information Susan Ward(

    From: State of Kentucky (State)

  • Install HVAC System at WRM Wearhouse, BLDG 975

    Type : Bid Notification

    Due : 14 Aug, 2023 (8 months ago)
    Posted : 9 months ago
    Started : 26 Jul, 2023 (9 months ago)

    *****This is a Work Plan Task Order for the following MATOC Contractors Only: W91QVN-18-D-0080, 0082, 0084, 0085, 0091, 0115 and 0116.Install HVAC System at WRM Wearhouse, Building 975, Kunsan AB, South Korea.

    From: Federal Government (Federal)

  • Butterick Bldg HVAC v2

    Type : Bid Notification

    Due : 24 Jan, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 19 Dec, 2018 (about 5 years ago)

    Install Mitsubishi CityMULTI heat pump system along with three energy recovery ventilators, electric unit heaters, one air intake hood and two exhaust units.

    From: Massachusetts (State)

  • 18 DM #8 - Replace HVAC System Bldg 19

    Type : Bid Notification

    Due : 18 Jun, 2020 (about 3 years ago)
    Posted : about 4 years ago
    Started : 11 May, 2020 (about 4 years ago)

    Contractor to furnish & install all necessary labor, materials, equipment & incidentals required to replace the HVAC System in Bldg 19 @ PDC

    From: California (State)

  • Bldg 930 HVAC Repair

    Type : Bid Notification

    Due : 14 Jun, 2018 (about 5 years ago)
    Posted : about 6 years ago
    Started : 31 May, 2018 (about 5 years ago)

    Work also includes removal of existing HVAC system and install new HVAC system.   The existing chiller, air compressor and refrigerated air dryer will be removed in its entirety.  The new HVAC system will consist of equally sized heat pump split systems. Work will include HVAC, ductwork, electrical, and all finish work needed to give a complete and usable product.  

    From: Federal Government (Federal)

  • Install HVAC Buttons Base-wide

    Type : Bid Notification

    Due : 28 Apr, 2017 (about 7 years ago)
    Posted : about 7 years ago
    Started : 28 Mar, 2017 (about 7 years ago)

     The 934th Airlift Wing will be soliciting for Project #QJKL 16-0009, Install HVAC Buttons Base-wide.Work to be performed within NAICS code: 238210 (Electrical Contractors) size standard $15M. Alter and/or modify existing Heating, Ventilation and Air Conditioning (HVAC) control wiring, conduit, etc. as necessary. Furnish and install HVAC shut off buttons in Buildings 710, 756, 805, 807, 820, 821 East and 862.  Performance period is 90 days.

    From: Federal Government (Federal)

  • 118th Wing Bldg 803 HVAC Replacement

    Type : Bid Notification

    Due : 10 Dec, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 22 Nov, 2021 (about 2 years ago)

    The Tennessee Air National Guard, Berry Field ANG Base, Nashville, TN has been tasked to solicit for and award a project to include but not limited to provide all plant, labor, transportation, materials, tools, equipment to demolish and remove from installation an existing 27 ton HVAC rooftop unit (RTU) from building 803 and install a new 35 ton RTU at same location.  

    From: Federal Government (Federal)