Type : Bid Notification
The purpose of this Amendment 0005 is to cancel the solicitation in its entirety.
The purpose of this Amendment 0005 is to cancel the solicitation in its entirety.
STATEMENT OF WORKFORUSCG Base New Orleans HousingStation Grand Isle LA, 70358CERTIFICATION OF REPLACEMENT OF NATURAL GAS LINES AT TWO GOVERNMENT OWNED HOUSING UNITS IN GRAND ISLE LA, 70358 FOR USCG BASE NEW ORLEANS HOUSINGPART 1 GENERAL1.01 INTENT: Removal, disposal, install, and test of new natural gas lines at unit 03 and 11 Paratus Pl.
(E.D.T) through the City’s Bidding System: www.biddingo.com/windsor, to supply and deliver all labour, materials, equipment, services, warranty, and permits as required to replace existing generator with new, install new UPS and upgrade natural gas line to building at Jefferson Police, 2696 Jefferson Blvd., Windsor, ON A mandatory site meeting will be held on Friday, April
Adams Towers, to include DHW, at AT.2.2.3 Remove existing Propane System and install new Natural Gas Line from Jessi Doe (studenthousing) to Adams Towers.2.2.4 All systems will be commissioned by a third-party contractor.
PROJECT TITLE: Install New Gas Meter and Gas Pipeline to Laundry Service CONTRACT TYPE: Firm Fixed Price PROJECT SUMMARY: The Contractor shall provide all supervision, tools, equipment and materials necessary to install a new 4-inch gas line and new gas meter from the incoming main gas point to Building 1 Laundry at the West Palm Beach VA Medical Center. The new 4-inch pipe will be installed underground and is approximately 350 feet.
Install new 25 ton gas package unit for the gym Install bracket to support duct work Run new gas line to the unit Run electrical to the unit Complete start up on the unit 1 year parts and labor (minimum) 5 year compressor warranty (minimum) Number: 3170027131 Smart Number: 13234-20231213095859 BCSD Air RFx Type: MDA - RFx Advertised Date: 12/17/2023 4:00 PM Submission Date: 01/12/2024 10:00 AM Major Procurement Category: CONSTRUCTION Sub Procurement
new pool heater ix) Install new heater on existing cement pad x) Assemble pump and bypass assembly xi) Reroute existing water lines xii) Install new isolation values and flanges xiii) Reconnect electrical work xiv) Install new gas regulator and reroute gas line xv) Start up and balance the system xvi) Warranty for parts and labor, including passing on manufacturer’s warranty and installer’s labor E-Bidding No