Search results for: install new scroll compressor

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 8 of 8
  • Install New Scroll Compressor in Building 89

    Type : Bid Notification

    Due : 07 Apr, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 22 Mar, 2022 (about 2 years ago)

    The associated NAICS code is 238220 (Plumbing, Heating, and Air-Conditioning Contractors), with a small business size standard of $15 Million.USDA, ARS, SHRL13601 Old Cutler RoadMiami, FL 33158Is looking for Install New Scroll Compressor in Building 89 that fits into the associated Statement of Work.A site visit is recommended. The site visit is scheduled for Tuesday, March 15th at 9:00 am.

    From: Federal Government (Federal)

  • Compressed Air System Improvements

    Type : Bid Notification

    Due : 20 Feb, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 09 Feb, 2021 (about 3 years ago)

    Oil Free Rotary Scroll Enclosed Air Compressora. Provide and install new Powerex Model SEQ2007 Oil Free Rotary Scroll Enclosed Air Compressor (OR Approved Equal)b. Field verify all existing equipment technical data and dimensions prior to providing equipment submittals for NOAAc. Provide equipment submittals for NOAA review and acceptanced. Schedule shutdown work with NOAA Facilitiese. Provide factory authorized startup and testing reportf.

    From: Federal Government (Federal)

  • J--KC- Remove/Replace Air Compressors **Special**

    Type : Bid Notification

    Due : 19 Dec, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 18 Dec, 2018 (about 5 years ago)

    Contractor will provide all supervision, tools, equipment, materials and labor to:Provide and install a new Powerex SEQ40B74 Quadplex (or equal) Oil-Less Scroll Air Compressor with a twin tower desiccant dryer. Installation includes all electrical and mechanical materials and connections.Provide and install a new 200-gallon vertical receiver tank.

    From: Federal Government (Federal)

  • RFP for Air-Cooled Chiller Equipment Repair & Refresh for Curatorial Facility for Artifact Research

    Type : Bid Notification

    Due : 30 Aug, 2023 (7 months ago)
    Posted : 8 months ago
    Started : 01 Jan, 2023 (16 months ago)

    The repair and refresh must:Meet OEM specifications for all equipment.Ensure appropriate integration of replacement parts within BAS and within plan-view of Synchrony user-interface.Replace and install the following:Two new Trane compressors (CGAM Air-Cooled Scroll Chiller – OEM specification (hermetic, direct-drive, 3600 rpm 60 Hz (3000 rpm 50 Hz) suction gas-cooled scroll compressors)Contactors - compressor, fan, and pump packageSuction line fast

    From: Texas (State)

  • Z--Project: 640-20-904 - PA - Bldg 7 Control Lab Air Replacement - CONSTRUCTION

    Type : Bid Notification

    Due : 16 Oct, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 03 Oct, 2019 (about 4 years ago)

    **CONSTRUCTION PROJECT - 640-20-904, PA - Bldg 7 Control Lab Air Replacement.The Department of Veterans Affairs, VA Palo Alto Health Care System (VAPAHCS), has a requirement to: remove two (2) Quincy Control Air compressors, one (1) Nash Lab Air compressor, and one (1) Nash Lab vacuum system; and to install two (2) new Duplex Scroll Tank Mounted air compressors for Control Air, one (1) new Laboratory Scroll Air compressor unit, and one (1) new Laboratory

    From: Federal Government (Federal)