Search results for: install to exiting

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 32
  • CHILD DEVELOPMENT CENTER CAMERA INSTALL TO EXITING CCTV SYSTEM

    Type : Contract

    Due : 31 Oct, 2022 (17 months ago)
    Posted : 19 months ago
    Started : 16 Aug, 2022 (19 months ago)

    CHILD DEVELOPMENT CENTER CAMERA INSTALL TO EXITING CCTV SYSTEM Solicitation ID/Procurement Identifier: GS07F9671S Ultimate Completion Date: Mon Oct 31 17:00:00 GMT 2022

    From: Federal Procurement Data System (Federal)

  • Z--BUILDING 109: REPAIR BARREL ROOF NAVAL AIR STATION, PATUXENT RIVER, MD

    Type : Bid Notification

    Due : 18 Jul, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 03 Jul, 2018 (about 5 years ago)

    Contractor shall provide all labor and equipment necessary to demo exiting aluminum 3-foot roofing panels. Install primer to concrete suitable for a full torch applied roof system. Install 2 ply torch applied roofing system, install new roof flashing and flashing and caulk as required Approximately 3800 sq. ft. The work includes a request for quote (RFQ) and will be available on or after July 19, 2018.

    From: Federal Government (Federal)

  • 655-22-202 Removal of UST and Replacement with AST

    Type : Bid Notification

    Due : 28 Dec, 2023 (3 months ago)
    Posted : 8 months ago
    Started : 28 Dec, 2023 (3 months ago)

    This project will prepare site for demolition and removal of exiting UST Tank and Install new AST equipment for Building 19, Construction contractor shall furnish labor and materials and perform work for Project 655-22-202 Removal of UST and Replacement with AST for Generator in Building 19 at the VA Saginaw Healthcare System’s (VASHCS) Aleda E. Lutz VA Medical Center (ALVAMC) as required by drawings and specifications.

    From: Federal Government (Federal)

  • Project 655-22-202 Removal of UST and Replacement with AST

    Type : Pre-Bid Notification

    Due : 20 Jul, 2023 (8 months ago)
    Posted : 8 months ago
    Started : 05 Jul, 2023 (8 months ago)

    Contractor shall completely prepare site for demolition and removal of exiting UST Tank and Install new AST equipment for Building 19, Construction contractor shall furnish labor and materials and perform work for Project 655-22-202 Removal of UST and Replacement with AST for Generator in Building 19 at the VA Saginaw Healthcare System’s (VASHCS) Aleda E. Lutz VA Medical Center (ALVAMC) as required by drawings and specifications.

    From: Federal Government (Federal)

  • Y--Install panic hardware on doors at the Teen Center (Bldg. 970) and the Child Development Center (Bldg. 965A) at NAS Lemoore, CA.

    Type : Award

    Due : 19 Apr, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 05 Apr, 2018 (about 6 years ago)

    Demo exiting Panic hardware and Install new panic hardware with integrated alarm.

    From: Federal Government (Federal)

  • 6350--Lynx Notification System

    Type : Bid Notification

    Due : 31 Aug, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 28 Aug, 2021 (about 2 years ago)

    Provide and install duress notification strobes, panic buttons, police panic boxes and supporting licenses. 3. Specific Requirements: Install 500 Power over Ethernet (POE) Panic buttons and 2000 Seats throughout facility Install additional licenses for more staff members to have the ability to activate system for a response. Install Visual Strobes with sirens to alert all employees and visitors of a facility alert.

    From: Federal Government (Federal)

  • 6515--Equipment, VYLEATER SHREDDER - Lab, Cleveland

    Type : Bid Notification

    Due : 01 Nov, 2023 (4 months ago)
    Posted : 5 months ago
    Started : 26 Oct, 2023 (5 months ago)

    Vendor will consult with VA Engineering plumbing service to determine required plumbing requirements prior to install and delivery of the machine. Plastic Disposal Upon exiting the system, all plastic will be collected and then recycled per Executive Order 14008 All plastic will have been cleaned by the water flush system prior to discharge.

    From: Federal Government (Federal)