Type : Bid Notification
Schools renewed the contract for Extreme Wireless Access Point Configuration and Installation, RFP No.12-21/LM.
Schools renewed the contract for Extreme Wireless Access Point Configuration and Installation, RFP No.12-21/LM.
/2024 Last Modified: 3/27/2024 12:56 pm Solicitation Description: Concho Valley Council of Governments (CVCOG) is accepting proposals from qualified andexperienced contractors for the Installation and Configuration of Wireless Backup Network HardwareProposals will be due on 04/23/2024 no later than 4:00 PM CST to be received at 5430 Link Rd.
RFP Installation and Configuration of Unity 350F System, B181006 11/28/2017 2:00 PM Addendum #1
Description This contract was a competitive solicitation for Network Electronics Configuration for schools and administration sites to provide for the following: • The configuration and installation of 3,600 Extreme networks • Gathering VLAN and port configuration information on current switches • Upgrading code on new switches to a pre-determined version • Racking and cabling new switches to patch panels • Testing connectivity from the new switches
JAMF PREMIUM SERVICES SILVER - INSTALLATION CONFIGURATION - 1 YEAR Solicitation ID/Procurement Identifier: HHSN316201500011W Ultimate Completion Date: Sun Jan 19 18:00:00 GMT 2025
Project Title AV Installation and Configuration Services Invitation # 22-015 Bid Posting Date 09/08/2021 3:28 PM (PDT) Project Stage Bidding Bid Due Date 09/22/2021 4:00 PM (PDT) Response Format Electronic Project Type Bid Response Types Line Items Response File General Attachment Type of Award Lump Sum Categories 60400 - Audio Visual Equipment 60401 - Audio Visual
Description This contract was a competitive solicitation for Network Electronics Configuration for schools and administration sites to provide for the following: The configuration and installation of 3,600 Extreme networks Gathering VLAN and port configuration information on current switches Upgrading code on new switches to a pre-determined version Racking and cabling new switches to patch panels Testing connectivity from the new switches, and keeping