Search results for: installation of steel pipe

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 298
  • custom fabrication and installation of steel pipe

    Type : Bid Notification

    Due : 25 May, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 21 May, 2021 (about 2 years ago)

    NASA/NSSC has a requirement for Custom Pipe Fabrication and Installation of Steel pipe.NASA/NSSC intends to issue a sole source contract to Precision Fabricating & Cleaning Company, Inc. underthe authority of FAR 13.106-1(b)(1)(i). It has been determined that Precision Fabricating & Cleaning Company,Inc. is the sole provider of Custom Pipe Fabrication and Installation of Steel pipe.NASA/NSSC will be the procuring center for this effort.

    From: Federal Government (Federal)

  • Sanitary Sewer Upsizing - Old Wooler Road

    Type : Bid Notification

    Due : 14 May, 2024 (in 8 days)
    Posted : 1 month ago
    Started : 26 Mar, 2024 (1 month ago)

    of steel casing pipe under existing culverts, removal and installation of sanitary trunk sewer including its services and appurtenances, the removal of the existing watermain where required and the installation of new watermain including its services and all appurtenances as noted, the removal of the existing storm sewer where required and the installation of new storm sewer and appurtenances, rock excavation, dewatering, modification of existing

    From: Quinte West (County)

  • Roadwork-SUPPLY and INSTALLATION of THREE 2 000 mm POLYMER COATED CORRUGATED STEEL PIPE CULVERTS 63m

    Type : Bid Notification

    Due : 21 May, 2024 (in 16 days)
    Posted : 2 days ago
    Started : 02 May, 2024 (3 days ago)

    Roadwork-SUPPLY and INSTALLATION of THREE 2 000 mm POLYMER COATED CORRUGATED STEEL PIPE CULVERTS 63m Highways HWY-H24029 May 02, 2024 09:00 AM CST May 21, 2024 02:00 PM CST Open

    From: Saskatchewan (State)

  • Alameda Corridor Southern Terminus Gap Closure

    Type : Bid Notification

    Due : 30 Jul, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 25 Jun, 2020 (about 3 years ago)

    In addition, the Work includes installation of fencing with K-rail, striping, installation of steel pipe casings and concrete slabs at existing utilities that cross under new railroad tracks including driving piles under a new concrete slab at existing storm drain, constructio

    From: Los Angeles Business Assistance Virtual Network (Other)

  • 20-037 East 8th Street Bridge Railing Repair

    Type : Bid Notification

    Due : 24 Jun, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 09 Jun, 2020 (about 3 years ago)

    In general, this project will consist of the demolition of existing damaged concrete pilasters, the construction of reinforced concrete pilasters, installation of steel pipe railing, and other miscellaneous items incidental to the construction at the E. 8 th Street Bridge (over Fountain Creek) as detailed in the plans and specifications for this project.

    From: Pueblo (City)

  • Alameda Corridor Southern Terminus Gap Closure

    Type : Bid Notification

    Due : 30 Jul, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 25 Jun, 2020 (about 3 years ago)

    In addition, the Work includes installation of fencing with K-rail, striping, installation of steel pipe casings and concrete slabs at existing utilities that cross under new railroad tracks including driving piles under a new concrete slab at existing storm drain, constructio NAICS: 237110: Water and Sewer Line and Related Structures Construction 237130: Power and Communication Line and Related Structures Construction 237310: Highway, Street, and

    From: Los Angeles World Airports (Airport)

  • Roadwork-SUPPLY AND INSTALLATION OF POLYMER LAMINATED CORRUGATED STEEL PIPE CULVERTS total 80m

    Type : Bid Notification

    Due : 18 Apr, 2024 (16 days ago)
    Posted : 1 month ago
    Started : 26 Mar, 2024 (1 month ago)

    Roadwork-SUPPLY AND INSTALLATION OF POLYMER LAMINATED CORRUGATED STEEL PIPE CULVERTS total 80m Highways HWY-H23189 Mar 26, 2024 02:00 PM CST Apr 18, 2024 02:00 PM CST Open

    From: Saskatchewan (State)