Type : Bid Notification
Download Bid: 23-053 KLL — PDF document, 504Kb Due Date/Time: Mar 28, 2023 03:00 PM Contact: Kelly Lee (505) 878-6124 Lee_k@aps.edu
Download Bid: 23-053 KLL — PDF document, 504Kb Due Date/Time: Mar 28, 2023 03:00 PM Contact: Kelly Lee (505) 878-6124 Lee_k@aps.edu
Project Title No Trespassing Signs and Poles Installed Invitation # 2021-9497 Bid Posting Date 05/20/2021 12:35 PM (PDT) Project Stage Awarded Bid Due Date 05/26/2021 2:00 PM (PDT) Response Format Electronic Project Type RFQ (Request for Quote) Response Types Line Items General Attachment (required) Type of Award Lump Sum Categories 96279 - Sign Making Services
We manage public lands, provide technical and financial assistance to state and private forestry agencies, and make up the largest forestry research organization in the world.1.2 The Forest Service’s Built EnvironmentThe agency’s “Built Environment” refers to the physical infrastructure of fire, administration, research, recreation buildings, landscape structures, site furnishings, structures on roads and trails, and signs installed or operated by
Provide labor and material to install traffic control signs to include: Provide and install 3 ea 30X30X2.5 LED red X green down arrow signs with a minimum of 120-277 VAC and UL/cUL listed for wet conditions to be installed on Hursey Gate Canopy. The signs must be installed on 2”X2” steel tube frames attached to the canopy and painted with black epoxy paint. Conduit and conductors will be installed from the guard shack to the signs.
The boundary signs shall be installed so the taller end of the signs are closestUS Highway 550. The Forest Service shield signs (S-18) will be located on the west end ofthe sign base.The FE-3 boundary sign will be located on the north side of the sign base and the FL-3boundary sign will be located on the south sided.
edition of the MUTCD, SHS & the NYS supplement.Remove/Supply/Replace all Building Signs in accordance with the Engineering Specification.As-builtsAll installed signs are to be located and shown on a layout drawing.
Currently we have identified 15 signs as listed in the below table and in the Cost Summary section of this document as well as pictured in the attached booklet, Exhibit B. We anticipate all signs installed on or about July 15, 2020.