Type : Bid Notification
Executive Order: 11990 (Wetlands Protection) Executive Order:11988 (Floodplain Protection) Executive Order:12898 (Environmental Justice) Clean Air Act Clean Water Act Fish and Wildlife Coordination Act U.S.
Executive Order: 11990 (Wetlands Protection) Executive Order:11988 (Floodplain Protection) Executive Order:12898 (Environmental Justice) Clean Air Act Clean Water Act Fish and Wildlife Coordination Act U.S.
Notice of Intent and Public Comment Ruby, AlaskaRUBY SLOUGH ROAD REHABILITATION NFHWY00630Alaska Department of Transportation & Public Facilities (DOT&PF) is soliciting comments on the proposed Ruby Slough Road Rehabilitation project. DOT&PF plans to reconstruct approximately 3 miles of the existing Ruby Slough Road extending from the Ruby landfill to Ruby Slough.
Notice of Intent and Public Comment Brevig Mission Airport Access Road and Resurfacing Project #: NFAPT00500The Alaska Department of Transportation and Public Facilities (DOT&PF), in cooperation with the Federal Aviation Administration (FAA), is proposing improvements to the Brevig Mission Airport. The project would commence in the winter of 2022-23, and require approximately 10 months to complete. The project consists of:1.
Construction is expected to begin in 2025.Public Open House will be held on October 13, 2022 from 2:00-3:30 p.m. at the Circle Mining Historical Museum in Central, Alaska.
This project will provide improvements such as a rehabilitation of the roadway, widening the roadway to add shoulders, and improving drainage (cleaning and reconditioning ditches and repairing or replacing culverts) where necessary.We are working on preliminary engineering and environmental studies as well as soliciting public comments.
Construction is expected to begin in 2025.Public Open House will be held on October 13, 2022 from 2:00-3:30 p.m. at the Circle Mining Historical Museum in Central, Alaska.The project actions will have minor encroachment in the Crooked Creek floodplain.The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by the DOT&PF pursuant to 23 U.S.C. 327
State of Alaska Department of Transportation & Public Facilities (DOT&PF)Notice of Intent to Begin Engineering and Environmental Studies & Request for Public Comment Steese Highway Mammoth Creek Bridge #831 Abutment Repairs Project No.