Type : Bid Notification
ES 18P047 Minneapolis Interceptor Study 4/4/2018 5/3/2018 RFP
ES 18P047 Minneapolis Interceptor Study 4/4/2018 5/3/2018 RFP
Evaluate all LMWWTP interceptors and tributary SSOs and CSOs for potential bottlenecks i. Scope of analysis will only include interceptors, CSOs, and SSOs. No sewers upstream of interceptors will be evaluated with this study. b. Additional modeling and model enhancements may be requested c. Additional monitoring may be requested d. Model Calibration and Validation may be requested e. Cost feasibility analysis of eliminating bottlenecks f.
The City of Jackson is currently inviting qualitied consulting firms to submit proposals for engineering services required for a study of the approximately 4,000 feet of brick sanitary sewer pipe that is the Monkey Run Interceptor Sewer from the crossing at West Avenue to the downstream terminus at the intersection of Trail Street and Jackson Street.
ENGINEERING SERVICES FOR FEASIBILITY STUDY OF THE SAND CREEK INTERCEPTOR PARALLE
The results of the study are presented in the "Oakland-Macomb Interceptor Drain Odor and Corrosion Control Draft Study Report", dated March 2021. A copy of the Report is contained in Appendix B of the RFP. ...
Business Case Analysis July 2008.pdfDocumentationSupporting documentJun 1st 2023, 2:11 PM EDT - EBMC PS No. 1 11x17 Drawings dated Dec 2007.pdfDocumentationSupporting documentJun 1st 2023, 2:11 PM EDT - Muddy Creek East Branch Interceptor Pump Stations Study dated April 2000.pdfDocumentationSupporting documentJun 1st 2023, 2:11 PM EDT - PA Template 9 1 2022.pdfDocumentationSample Terms & Condition of a Professional Services AgreementRead more...Jun