Type : Bid Notification
Contractor will supply all materials, labor, supervision, and other incidentals needed to complete: the interior demolition (including asbestos abatement), window removal, and installation of sheathing at the Ripton barracks; and optionally, the removal of the vault toilet building, removal of the concrete pad and tank, installation of framing and siding, and backfilling the hole (from the removed building/tank) at the blacksmith shop in Windsor County