Search results for: island hot mix

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 241
  • 2022 Camano Island Hot Mix Asphalt Overlays

    Type : Bid Notification

    Due : 25 May, 2022 (23 months ago)
    Posted : about 2 years ago
    Started : 14 Apr, 2022 (about 2 years ago)

    Project Description:This Contract provides for the improvement of various public roads on Camano Island by planing existing surface and placing Hot Mix Asphalt as identified in the typical section table, drawings, and vicinity maps and other work, all in accordance with the Contract Provisions, Contract Plans and the Standard Specifications. Owner: Island County Public Works P.O.

    From: Island County (County)

  • 5.80 mi of hot mix asphalt base crushing and shaping, aggregate shoulder and guardrail on Thousand Island Road north of ...

    Type : Bid Notification

    Due : 05 Dec, 2017 (about 6 years ago)
    Posted : about 6 years ago
    Started : 21 Nov, 2017 (about 6 years ago)

    5.80 mi of hot mix asphalt base crushing and shaping, aggregate shoulder and guardrail on Thousand Island Road north of Roddis Road, Gogebic County. This is a Local Agency Project. ** 1387 Cb **In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Ea. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor.

    From: Michigan Department of Transportation (Transportation)

  • 0.20 mi of hot mix asphalt pavement removal and replacement, concrete curb and gutter, median island...

    Type : Bid Notification

    Due : 06 Mar, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 14 Feb, 2020 (about 4 years ago)

    Proposal 50031-204872 0.20 mi of hot mix asphalt pavement removal and replacement, concrete curb and gutter, median island and pavement markings on M-97 at CN railroad crossing near Little Mack, Macomb County. This is a Small Business Program project.

    From: Michigan Department of Transportation (Transportation)

  • IFB #2024-02 - Furnish Base Course, Sand, Cold Mix, Hot Mix, and No. 3F Rockto the Department of Water Supply

    Type : Bid Notification

    Due : 01 May, 2024 (in 4 days)
    Posted : 17 days ago
    Started : 24 Mar, 2024 (1 month ago)

    SEALED BIDS for MATERIAL BID NO. 2024-02 , FURNISH BASE COURSE, SAND, COLD MIX, HOT MIX, AND NO. 3F ROCK TO THE DEPARTMENT OF WATER SUPPLY, Districts – Entire Island, County of Hawai‘i, State of Hawai‘i, on an as needed basis, for a contract period starting July 1, 2023, to June 30, 2024, will be received ELECTRONICALLY by the Department of Water Supply, County of Hawai‘i, until May 2, 2023, at 2:30 p.m. . when they will be publicly opened.

    From: Hawaii (County)

  • 0.34 mi of hot mix asphalt widening for center turn lane, cold milling and hot mix asphalt resurfaci...

    Type : Bid Notification

    Due : 10 Jul, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 09 Jun, 2020 (about 3 years ago)

    Proposal 28012-132593 0.34 mi of hot mix asphalt widening for center turn lane, cold milling and hot mix asphalt resurfacing, median island and sidewalk construction, landscaping and minor drainage work on US-31/M-37 from Griffin Street Northerly to 10th?

    From: Michigan Department of Transportation (Transportation)

  • MPA 115 Asphalt, Cold Patch, Hot Patch, Berm Mix and Winter Mix

    Type : Bid Notification

    Due : 19 Aug, 2022 (20 months ago)
    Posted : 21 months ago
    Started : 22 Jul, 2022 (21 months ago)

    Number Name Manufacturer Name Qty Unit Delivery Address Desired Delivery Date 1 Cold Patch Material, Picked Up - Per the Attached Specifications 1000 ton (US); or short ton (UK/US); 2 Hot Patch Asphalt Mix - Per the Attached Specifications 7500 ton (US); or short ton (UK/US); 3 Berm Mix - Per the Attached Specifications 500 ton (US); or short ton (UK/US); 4 Winter Mix - Same Specification As Hot Patch 100 ton (US); or short ton (UK/US); 4 total 1

    From: Rhode Island (State)

  • Pavement Milling, Hot Mix Asphalt Overlay, with Drainage and Safety Improvement

    Type : Bid Notification

    Due : 20 Mar, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 15 Mar, 2019 (about 5 years ago)

    3/20/2019 022470.00 Herseytown Township, Sherman, Crystal, Island Falls, Dyer Brook, Oakfield, Smyrna, Ludlow, New Limerick & Houlton - Region 5 Pavement Milling, Hot Mix Asphalt Overlay, with Drainage and Safety Improvements/located on Interstate 95 Northbound beginning at the T1 R6-Herseytown TWP town line and extending north 48.89 miles to the Canadian border. 3/15/2019

    From: Maine Department of Transportation (Transportation)