Type : Bid Notification
Chief Joseph Dam ISO-Phase Powerbus Units 1-16. Please refer to the attached solicitation document, specifications, and drawings for all details.Amendments 0001 and 0002 have been issued and uploaded to PIEE and SAM.gov.
Chief Joseph Dam ISO-Phase Powerbus Units 1-16. Please refer to the attached solicitation document, specifications, and drawings for all details.Amendments 0001 and 0002 have been issued and uploaded to PIEE and SAM.gov.
Army Corps of Engineers (USACE) owned vessels located at Chief Joseph Dam in Bridgeport, WA. The contractor shall provide all personnel, supervision, professional expertise, vehicles, tools, materials, services, equipment, and quality control to perform vessel maintenance.
The successful quoter shall be required to deliver the Container shower/restroom to Chief Joseph Dam within 120 days after date of award, partial delivery is acceptable.
The US Army Corps of Engineers requires miscellaneous piping components to be delivered to Chief Joseph Dam (CJD) in Bridgeport WA. Specifications can be found in the attached solicitation.Amendment W912DW23Q0022R0001 is posted on 5 May 23. Please see the attached file.***Please note that this posting is a repost of Notice W912DW23Q0023. This action was taken to correct the Notice ID to reflect the correct solicitation number of W912DW23Q0022.
Provide all labor, materials, and equipment necessary to perform vessel maintenance service on Natural Resource Management vessel(s) at Chief Joseph Dam in accordance with the Performance Work Statement.
The US Army Corps of Engineers requires miscellaneous piping components to be delivered to Chief Joseph Dam (CJD) in Bridgeport WA. Specifications can be found in the attached solicitation.
Contract Title: Chief Joseph Dam Spillway Monolith Sealing, Bridgeport, WA.The work includes drilling and installation of six water stops and incidental related work. In general, the contractor shall complete precision angle drilling within precise tolerances to inject a hydrophilic sealant into the upstream spillway monoliths at fourlocations in the overflow section and one location on the non-overflow section.