Type : Bid Notification
Contract Title: Chief Joseph Dam Spillway Monolith Sealing, Bridgeport, WA.The work includes drilling and installation of six water stops and incidental related work. In general, the contractor shall complete precision angle drilling within precise tolerances to inject a hydrophilic sealant into the upstream spillway monoliths at fourlocations in the overflow section and one location on the non-overflow section.