Type : Bid Notification
The Jumbo Dome Road Corridor permits were renewed on June 27, 2023 for a fourth permit term.
The Jumbo Dome Road Corridor permits were renewed on June 27, 2023 for a fourth permit term.
Jumbo Dome Mine 12 miles northeast of Healy Alaska PO Box 1000 Healy, AK 99743 Permit Coverage: Jumbo Dome Mine is a surface coal mine located about 12 miles northeast of Healy, Alaska. Usibelli Coal Mine, Inc. operates the Jumbo Dome Mine. All the storm water and groundwater that contacts the active mine area is considered mine drainage.
Box 1000, Healy, Alaska 99743 to renew the surface coal mining permit for the Jumbo Dome Mine, Permit Number S-0606.The Jumbo Dome Mine is located on State Land approximately 90 miles south of Fairbanks, Alaska, and 9 miles northeast of Healy, Alaska. The Jumbo Dome Mine permit area consists of approximately 3,237.7 acres of which 1098.7 will be disturbed over the 27-year mine life.
Box 1000, Healy, Alaska 99743 to renew the surface coal mining permit for the Jumbo Dome Mine, Permit Number S-0606.The Jumbo Dome Mine is located on State Land approximately 90 miles south of Fairbanks, Alaska, and 9 miles northeast of Healy, Alaska. The Jumbo Dome Mine permit area consists of approximately 3,237.7 acres of which 1098.7 will be disturbed over the 27-year mine life.
Jumbo Dome Mine 12 miles northeast of Healy Alaska PO Box 1000 Healy, AK 99743Project and Location: Jumbo Dome Mine is a surface coal mine located about 12 miles northeast of Healy, Alaska. Usibelli Coal Mine, Inc. operates the Jumbo Dome Mine. All the storm water and groundwater that contacts the active mine area is considered mine drainage.
Pursuant to 11 AAC 90.167(b) UCM has proposed a reclamation bond in the amount of $76,357.00 to cover the associated reclamation liability of 7 of the proposed 30 drill holes and monitoring wells at Jumbo Dome Mine permit. UCM continues to maintain 3 test pits, 22 monitoring wells, and reclaiming up to 30 additional exploration holes, and up to 16 miles of access trails.