Search results for: lake access bridge underside

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 36
  • Rough River Lake Access Bridge Underside Painting

    Type : Award

    Due : 04 Apr, 2023 (13 months ago)
    Posted : 13 months ago
    Started : 24 Mar, 2023 (13 months ago)

    Product Service Code:- Z2LB - REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS NAICS Code:- 238320 - Painting and Wall Covering Contractors Primary point of contact:- Adrienne Manuel Adrienne.C.Manuel@usace.army.mil Secondary point of contact:-

    From: Federal Government (Federal)

  • McKellar River Bridge - Deck Replacement

    Type : Bid Notification

    Due : 07 May, 2024 (in 4 days)
    Posted : 20 days ago
    Started : 28 Mar, 2024 (1 month ago)

    Submission Address: Online Submissions Only Public Opening: No Description: MCKELLAR RIVER BRIDGE – DECK REPLACEMENT Bid Document Access: Bid document preview, bid opportunity, and award notices are available on the site free of charge.

    From: Thunder Bay (City)

  • Rehabilitation of Shore Drive Bridge Over Little Creek

    Type : Bid Notification

    Due : 28 May, 2024 (in 25 days)
    Posted : 7 hours ago
    Started : 02 May, 2024 (Yesterday)

    The Work under this project includes installing an epoxy deck overlay, applying waterproofing to concrete on bridge and approach railing pedestal, fascia, fascia beams, light post support precast cladding, and substructure, performing structural concrete repairs, painting of the aluminum railing, repair and replacing select tree grate frames, and other minor site civil related work.

    From: Norfolk (City)

  • Ascutney Basin Bridge (Bridge #63) Project

    Type : Bid Notification

    Due : 30 Apr, 2024 (2 days ago)
    Posted : 14 days ago
    Started : 21 Feb, 2024 (2 months ago)

    control and traffic control. 2.6 A temporary bridge was installed on the southern downstream side of the Ascutney Basin bridge.

    From: Weathersfield (Town)

  • Three-Span Bridge over the Birdtail Creek

    Type : Bid Notification

    Due : 30 Jun, 2023 (10 months ago)
    Posted : 10 months ago
    Started : 19 Jun, 2023 (10 months ago)

    Three-Span Bridge over the Birdtail Creek Project Description :Removal of culvert crossing and construction of new three-span bridge in Rossburn Municipality. See attached documents.

    From: MerX (Federal)

  • Belton Bridge Road Waterline Extension

    Type : Bid Notification

    Due : 05 Sep, 2023 (8 months ago)
    Posted : 8 months ago
    Started : 03 Aug, 2023 (9 months ago)

    Buyer Contact: Alexandra Pavluscenco apavluscenco@rindt.com 7704278123 Description: The Project consists of, but is not limited to, installation of approximately 870 LF of 6-inch PVC water pipe along the shoulder of Belton Bridge Road in Lula, GA via open trench method of installation.

    From: Georgia (State)

  • 53--CLAMP,BRIDGE

    Type : Bid Notification

    Due : 30 Jun, 2023 (10 months ago)
    Posted : 10 months ago
    Started : 20 Jun, 2023 (10 months ago)

    Proposed procurement for NSN 5340013124531 CLAMP,BRIDGE: Line 0001 Qty 157 UI EA Deliver To: DLA DISTRIBUTION RED RIVER By: 0329 DAYS ADO Line 0002 Qty 1114 UI EA Deliver To: DLA DISTRIBUTION RED RIVER By: 0329 DAYS ADO Line 0003 Qty 1 UI EA Deliver To: DLA DISTRIBUTION RED RIVER By: 0120 DAYS ADO All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically.

    From: Federal Government (Federal)