Hanging Lake Tunnel (HLT) Lighting Upgrade Location Colorado Publication Date 08/30/2019 Closing Date 09/26/2019 02:00 PM MDT
Hanging Lake Tunnel (HLT) Lighting Upgrade Location Colorado Publication Date 08/30/2019 Closing Date 09/26/2019 02:00 PM MDT
City of Geneva Lake Tunnel Enhancements Agency: Geneva, City of Category:Architectural, Engineering & Surveying - Consulting & Other Services Issue Date:10/03/2022 Due Date: 10/25/2022 Ad Type:General
Added:Apr 27, 2018 9:52 amModified:Jul 02, 2018 5:10 pmTrack Changes IGF::OT::IGF Snow Lake Outlet Valve Replacement, Leavenworth, Washington
Project Scope: The multifaceted project focuses primarily on Spirit Lake’s drainage issues. Re-establishing the road from Windy Ridge to the south shore of the lake would allow access the area to make it easier to replace the aging intake gate. The proposed access road would be built along an old road used by the U.S.
IGF::OT::IGF Snow Lake Tunnel - Outlet Valve Replacement, Leavenworth National Fish Hatchery, Washington
Proposal C20437 This project, 20437 Glenwood Springs Hanging Lake Tunnels (F-08-AP and F-08-AQ), proposes to replace the current service garage doors that provide vehicular access between the two tunnels and to the command center. The existing doors are all to be replaced with the addition of a fire rated garage door and a barrier lift gate at each entrance.
Project Scope: The multifaceted project focuses primarily on Spirit Lake’s drainage issues. Re-establishing the road from Windy Ridge to the south shore of the lake would allow access the area to make it easier to replace the aging intake gate. The proposed access road would be built along an old road used by the U.S.