Addendum #2 Elkins Landfill Central Drain Way Improvement ARFQ : DEP1900000010 Summary DEPARTMENT OF ENVIRONMENTAL PROTECTION Mark A Cline Construction Published On : 8/24/18 Amended On : 9/25/18 Closing On : 10/2/18 10:30 AM EDT Time Left: 21:00:21 Intent Posted On: Open
Project:Ada County Landfill NRC 3 Lift C Horizontals Drain Rock Ref.
drains, landfill gas wells, and header piping); and all related management and support services required to complete the work. shopping_cart Solicitation Items No.
These components include but are not limited to landfill gas piping, sub-drain/lysimeter/leachate collection and removal system, earthworks, geomembrane, geotextile, drainage geo-composite, geosynthetic clay liner, and protective soils cover. and all work necessary to render the facility complete and operational.
Project Title Contractors Panel at the Riverside Regional Water Quality Control Plant, Citywide Sewer/Storm Drain Collection System and Tequesquite Landfill Invitation # 2117 Bid Posting Date 10/14/2021 5:00 PM (PST) Project Stage Bidding Bid Due Date 11/08/2021 4:00 PM (PST) Response Format Electronic Project Type RFQual (Request for Qualification) Response Types Response File General