Search results for: lanes and multimodal improvements

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 37
  • BAKERVIEW MULTIMODAL IMPROVEMENTS - DESIGN SERVICES RFQ

    Type : Bid Notification

    Due : 06 Sep, 2023 (7 months ago)
    Posted : 8 months ago
    Started : 17 Aug, 2023 (8 months ago)

    The Bakerview Multimodal Improvements project will widen Bakerview Road between James Street and Kramer Lane adding bicycle lanes in both directions, ADA compliant sidewalks on both sides, curb and gutter and stormwater collection and treatment, and two RRFB crossings.Services, including professional engineering services, and construction engineering and/or administration, may be added/removed from the contract contingent upon funding availability

    From: Bellingham (City)

  • widen roadway from 4 to 6 lanes and multimodal improvements

    Type : Contract

    Due : 26 Jan, 2023 (15 months ago)
    Posted : 19 months ago
    Started : 05 Oct, 2022 (19 months ago)

    See more details...

    From: Nevada Department of Transportation (Transportation)

  • Granite Construction Co seeks bids - NDOT 3948 On SR 445, Pyramid Highway, from Queen Way to Golden View Drive Widen roadway from 4 to 6 lanes and...

    Type : Bid Notification

    Due : N/A
    Posted : 17 months ago
    Started : 21 Nov, 2022 (17 months ago)

    REQUEST FOR SUB-QUOTES FROM CERTIFIED DISADVANTAGED AND SMALL BUSINESS (SBE/DBE) SUBCONTRACTORS, SUPPLIERS & HAULERS FOR: NDOT 3948 On SR 445, Pyramid Highway, from Queen Way to Golden View Drive Widen roadway from 4 to 6 lanes and multimodal improvements. Project No(s): NDOT 3948, NHP-0445(013) *Please note that there is a PLA associated with this project!

    From: Department of Transportation (Transportation)

  • CONSTRUCTION MANAGEMENT/GENERAL CONTRACTOR SERVICES FOR: Sheridan Boulevard Multimodal Transportation Improvement Project

    Type : Bid Notification

    Due : 06 Feb, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 05 Dec, 2019 (about 4 years ago)

    This project will improve Sheridan Boulevard to a six-lane roadway by adding a south-bound lane from the U.S. 36 bridge to Turnpike Drive. The TIP is the Denver metropolitan area plan for fiscally-constrained transportation projects. Projects are selected every four years. E-Bidding No Legal Ad  Please select either the View or Edit button to manage legal ad.

    From: Westminster (City)

  • Bay Drive Protected Bike Lanes and Path Design Phase

    Type : Bid Notification

    Due : 12 Apr, 2024 (19 days ago)
    Posted : 22 days ago
    Started : 15 Mar, 2024 (1 month ago)

    The City of Santa Cruz anticipates the design to include a two way separated bike lane on the west side of the roadway.

    From: Santa Cruz (City)

  • Bay Drive Protected Bike Lanes and Path Design Phase

    Type : Bid Notification

    Due : 12 Apr, 2024 (19 days ago)
    Posted : 1 month ago
    Started : 15 Mar, 2024 (1 month ago)

    The City of Santa Cruz anticipates the design to include a two way separated bike lane on the west side of the roadway.

    From: University of California Santa Cruz (Higher Education)

  • West Illinois Multimodal Improvements - Design Services RFQ

    Type : Bid Notification

    Due : 02 Dec, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 02 Nov, 2021 (about 2 years ago)

    The West Illinois Multimodal Improvements project consists of design, specification, and installation of new/replaced sidewalks, a roundabout, re-channelization and associated site restoration work along the West Illinois and Meridian Street corridors.

    From: Bellingham (City)