Type : Bid Notification
Library Building HVAC System plan sets, equipment schedules, general notes, mechanical scope of work and special conditions related to this project.
Library Building HVAC System plan sets, equipment schedules, general notes, mechanical scope of work and special conditions related to this project.
Number RFP#882 Title Engineering Design Services for HVAC Upgrades at Ferguson Library DiMattia Building Available Date 8/11/2022 12:00 AM Due Date 9/8/2022 4:00 PM Contact Information Josh Noggle, Building Systems Engineer, 203-977-5534 or jnoggle@stamfordct.gov Bid Type RFP
Senior Center Christa McAuliffe Branch Library Cushing ChapelEdgell Memorial Library Memorial Building Old Academy Building Fire Station #1Fire Station #2 Fire Station #3 Fire Station #5 Fire Station #7 (Fall Only)Village HallTo obtain Quote documents please follow this link, all questions and addendums will also go through vendor registry
Roof-mounted duct work has been a source of ongoing leaks inside the building. The Main Library is a prominent building with high student use. Maintaining historic elements and the structure of the building is important for the longterm use of this important campus structure.
SUMMARY The City of Framingham (the “City”) is seeking proposals from qualified HVAC contractors (“proponents”) for the completion of preventative maintenance (PM) tasks on a semi-annual basis for the HVAC systems of the following primary facilities: Animal Control Facility Callahan Senior Center Christa McAuliffe Branch Library Cushing Chapel Edgell Memorial Library Police Department Headquarters Main Library
Request for Proposals No. 882, Engineering Design Services for HVAC Upgrades at Ferguson Library DiMattia Building RFP Opening: September 8, 2022 at 4:00 PM No RFP Deposit Mandatory Pre-Proposal Meeting: August 23, 2022 at 10:00 AM. Meet outside of the main entrance to the Ferguson Library, located at 96 Broad Street, Stamford, CT 06901.
for the completion of preventative maintenance (PM) tasks on a semi-annual basis (unless otherwise noted) for the HVAC systems of the following primary facilities: ? Animal Control Facility ? Callahan Senior Center ? Christa McAuliffe Branch Library ? Cushing Chapel ? Edgell Memorial Library ? Police Department Headquarters ? Main Library ? Memorial Building ?