Search results for: lift stations

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 6,586
  • City of Bruceville-Eddy - New Lift Stations - REBID

    Type : Bid Notification

    Due : 09 May, 2024 (in 4 days)
    Posted : 1 month ago
    Started : 20 Mar, 2024 (1 month ago)

    NEW WASTEWATER SYSTEM – USDA RURAL DEVELOPMENT CONTRACT #3 – New Lift Stations – four (4) new lift stations (Reduced Scope of Work) BID DATE CHANGED BY ADDENDUM NO. 1 - THURSDAY, MAY 9, 2024 - 10:00 A.M. - BRUCEVILLE-EDDY CITY HALL, 144 WILCOX DRIVE, EDDY, TEXAS.

    From: Tabor Associates Inc (Co-op)

  • Sewage Lift Stations Thousand Hills State Park Kirksville

    Type : Bid Notification

    Due : 21 May, 2024 (in 16 days)
    Posted : 16 days ago
    Started : 03 Apr, 2024 (1 month ago)

    Scope: The project includes the rehabilitation of 5 lift station valve vaults and wet wells, new control panels, new pumps, new electrical service connections, and decommission of 1 lift station w/ bypass piping. B. MBE/WBE/SDVE Goals: MBE 10%, WBE 10%, and SDVE 3%.

    From: Missouri Office of Administration (State)

  • Public Bid #WW3006- Sanitary Sewer Lift Stations K & F Rehabilitation Project

    Type : Bid Notification

    Due : 11 Jun, 2024 (in 1 month)
    Posted : 1 day ago
    Started : 18 Apr, 2024 (16 days ago)

    The Project is located at Lift Station K (3300 East Dunne Avenue) and Lift Station F (17109 Holiday Drive) Morgan Hill, CA 95037, and is described as follows: Lift Station K & F Rehabilitation includes all work associated with rehabilitation of the sewer lift stations as shown on the plans including wet well rehab, electrical, paving, concrete slab, abandoning existing force main and/or slip lining as shown on plans.

    From: Morgan Hill (City)

  • NR-23-C1 - Storm Sewer Lift Station Rehab/Reconstruction & Incidentals

    Type : Bid Notification

    Due : 08 May, 2024 (in 3 days)
    Posted : 1 month ago
    Started : 13 Mar, 2024 (1 month ago)

    Completion Date:May 31, 2025 Description: Description:The Fargo Street Department identified several storm sewer lift stations that are in need of repair and safety upgrades. The lift stations on this project include #3, #10 & #12.

    From: Fargo (City)

  • Lift Station Replacements - Phase 1

    Type : Bid Notification

    Due : 22 May, 2024 (in 17 days)
    Posted : 15 days ago
    Started : 03 May, 2024 (Yesterday)

    See Appendix A – Map, to better understand the various locations of the lift stations across the County. Fifteen (15) lift stations require a control panel replacement, one (1) lift station requires installation of a new generator, and most lift stations require replacing miscellaneous materials.

    From: Lee (County)

  • Sewer Lift Stations 1 and 2

    Type : Bid Notification

    Due : 02 May, 2024 (2 days ago)
    Posted : 1 month ago
    Started : 03 Apr, 2024 (1 month ago)

    Each lift station includes deep excavation with extensive dewatering, dry pit submersible non-clog wastewater pumps, in-channel grinders, equipment handling facilities, electrical power and control system, stand-by generator and transfer switch, HVAC systems and equipment, cast-in-place grinder vault, wet well, and dry pit, CMU building with equipment access area, electrical room, civil site and road improvements, and connections to a new gravity

    From: Utah (State)

  • Sewer Lift Stations 1 and 2

    Type : Bid Notification

    Due : 02 May, 2024 (2 days ago)
    Posted : 28 days ago
    Started : 03 Apr, 2024 (1 month ago)

    Each lift station includes deep excavation with extensive dewatering, dry pit submersible non-clog wastewater pumps, in-channel grinders, equipment handling facilities, electrical power and control system, stand-by generator and transfer switch, HVAC systems and equipment, cast-in-place grinder vault, wet well, and dry pit, CMU building with equipment access area, electrical room, civil site and road improvements, and connections to a new gravity

    From: Utah (State)