Search results for: line ac substations

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 83
  • New Haven Line AC Substations at Mamaroneck and Harrison

    Type : Contract

    Due : 07 Dec, 2022 (16 months ago)
    Posted : 17 months ago
    Started : 22 Nov, 2022 (17 months ago)

    New Haven Line AC Substations at Mamaroneck and Harrison Agency: New York State Contract Reporter Category:Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction Issue Date:11/22/2022 Due Date: 12/07/2022 Ad Type:Contractor Ads

    From: New York State Contract Reporter (City)

  • BUREAU OF INDIAN AFFAIRS (BIA), SAN CARLOS IRRIGATION PROJECT, (SCIP) AE IDIQ FOR PRE-DESIGN INVESTIGATION AND DESIGN OF POWER TRANSMISSION INFRASTRUCTURE

    Type : Bid Notification

    Due : 30 Mar, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 23 Mar, 2018 (about 6 years ago)

    Geotechnical Investigation & Grounding Design of substations and field personnel visiting substations will be qualified to work in and around high and medium voltage substations and be familiar with the live energized parts of a substation.

    From: Federal Government (Federal)

  • Campus Substation Equipment

    Type : Bid Notification

    Due : 05 Mar, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 12 Feb, 2021 (about 3 years ago)

    or line-to- ground voltages shall be of high-grade wet process porcelain or cycloaliphatic epoxy.

    From: Appalachian State University (School)

  • Buehring Power Plant

    Type : Bid Notification

    Due : 27 Aug, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 21 Aug, 2020 (about 3 years ago)

    The synchronized medium voltage buss bar will provide power to 2 medium voltage loops feeding 13 substations on the Camp Buehring power grid.

    From: Federal Government (Federal)

  • Pinnacle Peak Substation - Series Capacitor Breaker Replacement

    Type : Pre-Bid Notification

    Due : 21 Sep, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 04 Aug, 2021 (about 2 years ago)

    PINNACLE PEAK SUBSTATION SERIES CAPACITOR BREAKER REPLACEMENTThis is a competitive 100% Small Business Set-aside Invitation for Bid (IFB) related to the Pinnacle Peak Substation Series Capacitor Breaker Replacement Project. The acquisition is subject to the North American Industry Classification System (NAICS) code of 237130 with a size standard of $36.5 million.

    From: Federal Government (Federal)

  • 21-128 - St. George Energy Services Distribution Substation 67-13.2Y7.62 kV, 15-22 MVA Power Transformer

    Type : Bid Notification

    Due : 15 Feb, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 24 Jan, 2022 (about 2 years ago)

    The manufacturer shall include (in the main transformer tank) a current transformer for input to the line drop compensator. The Purchaser will provide a potential sensing source for operating the voltage regulating control, which will consist of one or three line to ground potential transformer (i.e. X1 and X0), as required, with a secondary voltage of 120 volts.

    From: St. George (City)

  • POWER TRANSFORMER FOR SUBSTATION 10 BERKLEY DRIVE

    Type : Bid Notification

    Due : 28 Nov, 2022 (17 months ago)
    Posted : 18 months ago
    Started : 28 Oct, 2022 (18 months ago)

    Any tax shall be included as a separate line item per the bid schedule 3. Invoice shall list the appropriate state sales tax as a separate item. 4.

    From: City of Rocky Mount (City)