Type : Bid Notification
This work will also include line striping (2 coats with reflective glass beads). Line striping detail provided by VA. The contractor shall be responsible for blocking off areas as required, furnishing the necessary barricades, signs, etc... all entrances shall remain operational at all times. High traffic areas or entrance into the hospital will require after hours or weekend work, including areas but not limited to: 4, 4A & 3.