Search results for: linear impact

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 23
  • Linear impact testing machine

    Type : Bid Notification

    Due : 08 Feb, 2023 (15 months ago)
    Posted : 15 months ago
    Started : 25 Jan, 2023 (15 months ago)

    25 January 2023 Linear impact testing machine Standard Linear Impactor Standard Linear Impactor Data acquisition system and tr-axial accelerometer NOCSEA Standard Blue headform/required attachments MEP pads, 43,68, and 90 shore A support plate 25 January 2023 Open 1/25/2023 2:30 PM CST Type BID - Formal Bid Close 2/8/2023 2:30 PM CST Number 743-2023-IFB-952 Currency US Dollar Sealed Until 2/8/2023 2:30 PM CST 25 January 2023 Contacts Robin Davis <

    From: The University of Texas at San Antonio (Higher Education)

  • Linear Impact Testing Machine

    Type : Bid Notification

    Due : 08 Feb, 2023 (15 months ago)
    Posted : 15 months ago
    Started : 25 Jan, 2023 (15 months ago)

    Contact Name: ROBIN DAVIS Contact Number: 210-458-5077 Contact Email: robin.davis@utsa.edu Response Due Time: 2:30 PM Agency/Texas SmartBuy Member Number: 743 Days Solicited: 14+ Days for Entire Solicitation Package Solicitation Posting Date: 1/25/2023 Response Due Date: 2/8/2023 Last Modified: 1/25/2023 2:02 am Solicitation Description: Specifications Required/Equipment needed:· Standard Linear

    From: Texas (State)

  • Barrier Reflectors, Linear Delineation Systems and Flexible Delineation Posts

    Type : Contract

    Due : 30 Sep, 2024 (in 4 months)
    Posted : 2 months ago
    Started : 25 Jan, 2024 (3 months ago)

    Contract Name : Barrier Reflectors, Linear Delineation Systems and Flexible Delineation Posts Barrier Reflectors, Linear Delineation Systems and Flexible Delineation Posts Supplier : IMPACT RECOVERY SYSTEMS INC Contract ID : CTR017812 State Contract Number : DOT12624-2 Contract Sub-Type: Single Agency Contract

    From: Ohio (State)

  • Notice of Application for State Water Quality Certification - POA-2023-00115 v1.0 Johnson River, JT Mining Inc. - Johnson Tract

    Type : Bid Notification

    Due : 07 Aug, 2023 (9 months ago)
    Posted : 10 months ago
    Started : 06 Jul, 2023 (10 months ago)

    WOTUS impacts include fill to 9.0 acres of wetlands and 1,470 ft. of linear impacts to streams resulting from culvert installation.The applicant proposes to discharge a total of 14,872 cubic yards of general embankment fill and 13,000 cubic yards of surfacing material into 9 acres of waters of the U.S. (WOTUS), including wetlands, to construct a portal access road and airstrip, and to impact 1,470 linear feet of streams by installing culverts.

    From: Alaska (State)

  • Z--Chair Rail Replacement

    Type : Bid Notification

    Due : 20 Aug, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 15 Aug, 2019 (about 4 years ago)

    Petersburg, FL. 33744 PERFORMANCE REQUIREMENTS: The St Petersburg VA Regional Office, VARO is in need of approximately 2,000 linear feet of Pawling WG-4 impact protection system (or equivalent product), and approximately 25 corner protections. Â Color: Pawling 297 Chinchilla. Contractor will remove old chair rail system.

    From: Federal Government (Federal)

  • Z--Chair Rail Replacement

    Type : Bid Notification

    Due : 26 Aug, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 21 Aug, 2019 (about 4 years ago)

    Petersburg, FL. 33744 PERFORMANCE REQUIREMENTS: The St Petersburg VA Regional Office, VARO is in need of approximately 2,000 linear feet of Pawling WG-4 impact protection system or equal specification product, and approximately 25 corner protections. Â Color: Pawling 297 Chinchilla. Contractor will remove old wall guard system and install new wall guard system.

    From: Federal Government (Federal)

  • Notice of Application for State Water Quality Certification - Red Dog Mine- Aqqaluk Pit Drill Roads and Pads

    Type : Bid Notification

    Due : 08 May, 2024 (in 4 days)
    Posted : 25 days ago
    Started : 08 Apr, 2024 (25 days ago)

    The West Ring Road crosses Sulfur Creek downstream of the proposed Bypass, totaling 340 linear feet of impacts to Sulfur Creek. The wider road will facilitate the use of larger mining equipment for construction as it does not directly impact wetlands. All drill road and drill pad fill material (gravel) will be sourced from the DD2 quarry site located on the west side of the Red Dog Mine Tailings Storage Facility.

    From: Alaska (State)