Type : Contract
INERT AND LIVE OC SPRAY Solicitation ID/Procurement Identifier: 70LGLY23PGLB00150 Ultimate Completion Date: Fri Jun 30 17:00:00 GMT 2023
INERT AND LIVE OC SPRAY Solicitation ID/Procurement Identifier: 70LGLY23PGLB00150 Ultimate Completion Date: Fri Jun 30 17:00:00 GMT 2023
ROOF DEAD LOAD 10 PSF LIVE LOADS i. ROOF LIVE LOAD 20 PSF WIND LOADS i. ROOF ZONE 1': +16.0 PSF / -27.8 PSF ii. ROOF ZONE 1: +16.0 PSF / -48.4 PSF iii. ROOF ZONE 2: +16.0 PSF / -63.8 PSF iv. ROOF ZONE 3: +16.0 PSF / -87.0 PSF v. WALL ZONE 4: +30.4 PSF / -32.9 PSF vi. WALL ZONE 5: +30.4 PSF / -40.7 PSF WIND LOADS i. ULTIMATE DESIGN WIND SPEED 130 MPH (3-SECOND GUST) ii. NOMINAL DESIGN WIND SPEED 101 MPH (3-SECOND GUST) iii. RISK CATEGORY II iv.
FIX EXTERIOR FLAP OF MAIL SLOT IN PLACE TO REMAIN, REMOVE INTERIOR MAIL DEFLECTOR AND SPRAY FOAM FROM SLOT. INFILL SLOT WITH WOOD TO MATCH DOOR, FILL AND SAND JOINT TO MINIMIZE PATCH APPEARANCE.
Heart rate monitors to enable the instructor to view trainees heart rate in real-time during live training and after-action reviews Practice shooting range Deliverables: VIRTUAL REALITY SIMULATOR: 3 1-Person simulator configuration with Service Package to include the following: VR head-mounted display that fully immerses a trainee into a realistic training environment.
The following format is used XXX (Dead Load + Live Load) / XXX (Live Load) / XXX (Net Wind Uplift -ASD forces). See roof plan notes for ASD Wind Downward Forces.
Switchgear manufacturer shall have performed a 5% minimum, salt spray endurance test for a minimum of 1500 hours continuous on the paint finish being proposed. 23.0 HARDWARE All bolting hardware to be high tensile strength zinc plated steel.
Switchgear manufacturer shall have performed a 5% minimum, salt spray endurance test for a minimum of 1500 hours continuous on the paint finish being proposed. 23.0 HARDWARE All bolting hardware to be high tensile strength zinc plated steel.