Search results for: locker rooms and offices

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 1,628
  • Softball Locker Rooms and Offices

    Type : Bid Notification

    Due : 10 Nov, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 21 Oct, 2021 (about 2 years ago)

    One-Two Sentences The project is for the advance planning of locker rooms and offices for softball. This facility is anticipated to be approximately 4,000 gross square foot and will include coaches offices, locker rooms, team room, equipment room, taping room and support spaces. Current project authorization is for advance planning only. The selected firm may be retained through full design and construction at the university's option.

    From: North Carolina University (Higher Education)

  • UNCC - Softball Locker Rooms and Offices

    Type : Bid Notification

    Due : 18 Apr, 2023 (12 months ago)
    Posted : 13 months ago
    Started : 06 Mar, 2023 (13 months ago)

    Tuesday, April 18, 2023 in Room 119, FM-PPS Building (# 55 on the campus map - http://facilities.uncc.edu/maps)on the UNC Charlotte campus and immediately thereafter publicly opened and read for the furnishing of labor, material and equipment for the: Softball Locker Rooms and Offices Plan Deposit $250 Complete plans and specifications may be obtained from the Designer

    From: UNC System Office Design Construction (Higher Education)

  • Professional services for the redevelopment of the locker rooms and offices of the Aquatic Center (Architectural and engineering services) ...

    Type : Bid Notification

    Due : 10 Apr, 2024 (18 days ago)
    Posted : 1 month ago
    Started : 08 Mar, 2024 (1 month ago)

    Reference:BP2407-17147 / 1823019 Professional services for the redevelopment of the locker rooms and offices of the Aquatic Center (Architectural and engineering services) --- Services professionnels pour le réaménagement des vestiaires et bureaux du Centre aquatique Source:Government of Quebec SEAO - register with SEAO to receive updates, amendments & addenda NEW OR UPDATED March 22, 2024 2024-04-10 11 h (Closing date appears to be Wednesday, April

    From: Government of Quebec (State)

  • Trout Run Water Pollution Control Center Conference Room / Offices / Locker Rooms Modifications - General and Electrical Contracts

    Type : Bid Notification

    Due : 06 Oct, 2023 (6 months ago)
    Posted : 7 months ago
    Started : 11 Sep, 2023 (7 months ago)

    DOCUMENT 00010INVITATION TO BIDProject: TROUT RUN WATER POLLUTION CONTROL CENTER CONFERENCE ROOM/OFFICES/LOCKER ROOMS MODIFICATIONS: Project generally consists of the demolition and removal of some interior and exterior features. Changes will include modifications to the locker room, conference room, offices, break room, laundry area, plumbing, heating/air-conditioning, and accessibility as shown on the Contract Drawings.

    From: Pennsylvania (State)

  • Softball Locker Rooms and Offices

    Type : Bid Notification

    Due : N/A
    Posted : 13 months ago
    Started : 08 Mar, 2023 (13 months ago)

    The site is adjacent to the existing Wells Fargo Athletic Building. The project will provide needed space for locker rooms, coaching staff offices and meeting space, training room, and equipment storage for the softball team. The facility is anticipated to be approximately 5,000 gross square feet. Visitor parking is available at LOT 26 adjacent to FM-PPS Building accessed off of Poplar Lane .

    From: University of North Carolina at Charlotte (Higher Education)

  • Repair toilets, locker rooms of bldg. S-110 & Repaint offices in bldg. P-2150

    Type : Bid Notification

    Due : 05 Sep, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 27 Aug, 2018 (about 5 years ago)

    NOTICE TO OFFERORS1. THIS IS A NON-WORK PLAN TASK ORDER RFP FOR MATOC CONTRACTORS ONLY.ONLY Proposals for this requirement are being solicited from the MATOC contractors for the following MATOC contracts issued by 411th Contracting Support Brigade (CSB). Proposals from offerors other than these MATOC contractors w ill not be considered for aw ard.CONTRACT NO. W91QVN-18-D-0053, 0054, 0055, 0056, 0057, 0058, 0059, 0060, 0062, 0063, 0064, 0065, 0066, 0067, 0068, 0069,0070,0071,0072, 0073, 0074, 0076, 0077, 0078, 0093 ,0094 and 01632.Site Visit: All MATOC offerors who intend to propose on this solicitation are strongly recommended to attend the site visit. See site visit clause in Section L for schedule.3.Submission of Proposal: See Sect...

    From: Federal Government (Federal)

  • IFB 124-102 Summer Painting 2024 Partial Re-bid - Statement of Work

    Type : Bid Notification

    Due : 30 Apr, 2024 (Tomorrow)
    Posted : 7 days ago
    Started : 06 Apr, 2024 (22 days ago)

    , auxiliary gym and (2) locker rooms across the hall: SW 6871 Positive Red, inside corner to inside corner (walls only) o Inset @ drinking fountain = SW 6871 Positive Red 3 All walls new neutral with accent 2 where shown; If accent wall is not identified on plan, paint new accent on existing accent wall – NO PAINT IF CLASSROOM, UNLESS ON ATHLETIC WING 4 Locker Rooms o Paint all paintable ceilings ceiling white o All walls = SW 7663 Monorail Silver

    From: Greenville County Schools (School)