Type : Bid Notification
IN ORDER FOR A PRODUCTION LOT TO BE ACCEPTABLE, ALL SAMPLES REPRESENTATIVE OF THE LOT MUST PASS ALL OF THE CONTRACT REQUIREMENTS. UPON NOTIFICATION OF ACCEPTANCE, SAMPLES WILL BE CONSIDERED PART OF THE PRODUCTION QUANTITY AND SHIPPED WITH THE REST OF THE PRODUCTION LOT. IN THE EVENT A SAMPLE FAILS TO PASS SUCH REQUIREMENTS, THE LOT WILL BE REJECTED. THE PCO WILL BE NOTIFIED 30 DAYS PRIOR TO THE CONTRACTORS DESIRED TEST DATE.