Search results for: lot testing

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 11,361
  • PRODUCTION LOT TESTING

    Type : Bid Notification

    Due : 03 May, 2024 (Tomorrow)
    Posted : 28 days ago
    Started : 03 Apr, 2024 (29 days ago)

    TESTING (MAY 2020) (1) The purpose of production lot testing (PLT) is to validate quality conformance of products.

    From: Federal Government (Federal)

  • PRODUCTION LOT TESTING

    Type : Bid Notification

    Due : 03 May, 2024 (Tomorrow)
    Posted : 5 days ago
    Started : 26 Apr, 2024 (6 days ago)

    MILITARY PROPERTY AVIATION LIFE SUPPORT PLT SAMPLES PRODUCTION LOT SAMPLE TESTING REQUIRED, GOVERNMENT TESTING. THE PRODUCTION LOT SAMPLE QUANTITY SHALL BE IN ACCORDANCE WITH ANSI/ASQC Z1.4-2008, LEVEL S-2, Table II-A, SINGLE SAMPLING PLANS FOR NORMAL INSPECTION, NO AQL WILL BE USED (per Engineering Support Activity, ESA). SELECTED AT RANDOM BY THE COGNIZANT GOVERNMENT REPRESENTATIVE. FOLLOW E04 FOR SHIPPING INSTRUCTIONS.

    From: Federal Government (Federal)

  • PRODUCTION LOT TESTING

    Type : Bid Notification

    Due : 06 May, 2024 (in 3 days)
    Posted : 2 days ago
    Started : 29 Apr, 2024 (3 days ago)

    MIL-STD-105/ASQ Z1.4 MAY BE USED TO SET SAMPLE LOT SIZE, BUT ACCEPTANCE WOULD BE ZERO NON-CONFORMANCES IN THE SAMPLE LOT UNLESS OTHERWISE SPECIFIED IN THE CONTRACT. RQ039: Non-Tailored Higher-Level Quality Requirements (SAE AS9100) for Manufacturers and Non-Manufacturers Contractor first article/preproduction approval testing required. Use DI-NDTI-80809B in preparation of the first article report.

    From: Federal Government (Federal)

  • PRODUCTION LOT TESTING

    Type : Bid Notification

    Due : 03 May, 2024 (Tomorrow)
    Posted : 5 days ago
    Started : 26 Apr, 2024 (6 days ago)

    DELIVER FOB: ORIGIN QTY VARIANCE: PLUS 0% MINUS 0% INSPECTION POINT: ORIGIN ACCEPTANCE POINT: ORIGIN Need Ship Date:00/00/0000 Original Required Delivery Date:00/00/0000 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * PRODUCTION LOT TESTING - GOVERNMENT TESTING REQUIRED (REFER TO PROCUREMENT NOTE E04 FOR ADDITIONAL INFORMATION) CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE . 0003 0000000000

    From: Federal Government (Federal)

  • PRODUCTION LOT TESTING

    Type : Bid Notification

    Due : 06 May, 2024 (in 4 days)
    Posted : 2 days ago
    Started : 29 Apr, 2024 (2 days ago)

    DELIVER FOB: ORIGIN QTY VARIANCE: PLUS 0% MINUS 0% INSPECTION POINT: ORIGIN ACCEPTANCE POINT: ORIGIN Need Ship Date:00/00/0000 Original Required Delivery Date:00/00/0000 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * PRODUCTION LOT TESTING - GOVERNMENT TESTING REQUIRED (REFER TO PROCUREMENT NOTE E04 FOR ADDITIONAL INFORMATION) CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE . 0003 0000000000

    From: Federal Government (Federal)

  • PRODUCTION LOT TESTING

    Type : Bid Notification

    Due : 03 May, 2024 (Tomorrow)
    Posted : 5 days ago
    Started : 26 Apr, 2024 (6 days ago)

    OF DOCUMENT BEING CONTINUED: CONTINUED ON NEXT PAGE PAGE 11 OF 27 PAGES SPE4A5-24-T-260G SECTION B PR: PRLI: CONT’D PRODUCTION LOT TESTING - GOVERNMENT TESTING REQUIRED (REFER TO PROCUREMENT NOTE E04 FOR ADDITIONAL INFORMATION) CLIN PR PRLI UI QUANTITY UNIT PRICE TOTAL PRICE . 0003 0000000000 EA 1.000 NSN/MATERIAL:S00000061 DELIVERY (IN DAYS):0215 THIS LINE ITEM SIGNIFIES THE PRODUCTION LOT TEST REQUIREMENT (PLT).

    From: Federal Government (Federal)

  • PRODUCTION LOT TESTING

    Type : Bid Notification

    Due : 22 May, 2024 (in 19 days)
    Posted : 9 days ago
    Started : 22 Apr, 2024 (10 days ago)

    OF DOCUMENT BEING CONTINUED: PAGE 10 OF 34 PAGES CONTINUED ON NEXT PAGE SPE4A7-24-Q-0738 SECTION E - INSPECTION AND ACCEPTANCE (CONTINUED) E04 PRODUCTION LOT TESTING (MAY 2020) (1) The purpose of production lot testing (PLT) is to validate quality conformance of products. The Government conducts PLT on the production lot(s) after first article approval, when a first article is required.

    From: Federal Government (Federal)