Type : Bid Notification
Low Lying Roads FBD.pdfDocumentationOct 3rd 2022, 7:32 AM EDT - Note To download files, Log in or Register for a Bonfire Account.
Low Lying Roads FBD.pdfDocumentationOct 3rd 2022, 7:32 AM EDT - Note To download files, Log in or Register for a Bonfire Account.
Provision of Chain link fencing in Low lying area at Main Campus, CIAB Tender Value in ₹:- Should Allow NDA Tender:- No
A grassed stormwater swale is located on the west side of the trail, while an existing low-lying wet area is located east of the trail alignment.TimelineAdvertisement/Release Project Date:March 15, 2024Question Submission Deadline:April 4, 2024, 11:59pmBid Opening:April 18, 2024, 3:01pm Microsoft Teams meeting Join on your computer, mobile app or room device
The Town of Lyndon, Vermont, is seeking qualified engineering consultant(s) to complete a scoping study to create a “hazard mitigation highway” that improves passage of floodwaters through the low lying lands of Lyndonville and adjacent areas. This project is funded by a subgrant from the State of Vermont under the Flood Resilient Communities Fund. The work is expected to commence mid October and conclude by December 2024.
The Town of Lyndon, Vermont, is seeking qualified engineering consultant(s) to complete a scoping study to create a “hazard mitigation highway” that improves passage of floodwaters through the low lying lands of Lyndonville and adjacent areas. This project is funded by a subgrant from the State of Vermont under the Flood Resilient Communities Fund. The work is expected to commence mid October and conclude by December 2024.
Shaded areas, low lying areas, fertile soil, etc all grow differently than the opposite conditions. Contractors are strongly encouraged to verify required work efforts via visual inspection during the site visit or at their own leisure prior to bid submission. An organized site visit has been scheduled for:Date: 10 Aug 2023Time: 09:00 AM CSTParticipants will meet at-Location: Harry S. Truman Project OfficeU.S.
Shaded areas, low lying areas, fertile soil, etc all grow differently than the opposite conditions. Contractors are strongly encouraged to verify required work efforts via visual inspection during the site visit or at their own leisure prior to bid submission. An organized site visit has been scheduled for:Date: 10 Aug 2023Time: 09:00 AM CSTParticipants will meet at-Location: Harry S. Truman Project OfficeU.S.