Search results for: low water crossing

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 8 of 8
  • Grosenbacher Rd Low Water Crossing

    Type : Bid Notification

    Due : 12 Dec, 2025 (in 19 months)
    Posted : 3 months ago
    Started : 04 Jan, 2024 (3 months ago)

    Details ID: kd1emz Estimate: $2,521,340.86 Type: construction Owner: Bexar County Location Bexar County, TX Map Code: Show Google Map Open Map On Google No Map Scope Bexar County Public Works Department Grosenbacher Rd Low Water Crossing The scope of the project is to improve the existing low water crossing located on Grosenbacher Rd @ Potranca Creek with structure capable of passing the 1% storm.

    From: Bexar (County)

  • PROJECT: FSR 520 <b>LOW</b> <b>WATER</b> <b>CROSSING</b> REPAIRS LOCATION: SUMTER NATIONAL FOREST, LONG CANE RANGER DISTRICT, 4931 BROAD RIVER RD, COLUMBIA SC 29210.

    PROJECT: FSR 520 LOW WATER CROSSING REPAIRS LOCATION: SUMTER NATIONAL FOREST, LONG CANE RANGER DISTRICT, 4931 BROAD RIVER RD, COLUMBIA SC 2...

    Type : Contract

    Due : 03 May, 2024 (in 7 days)
    Posted : 1 month ago
    Started : 04 Mar, 2024 (1 month ago)

    PROJECT: FSR 520 LOW WATER CROSSING REPAIRS LOCATION: SUMTER NATIONAL FOREST, LONG CANE RANGER DISTRICT, 4931 BROAD RIVER RD, COLUMBIA SC 29210. Solicitation ID/Procurement Identifier: 12455020D0006 Ultimate Completion Date: Fri May 03 17:00:00 GMT 2024

    From: Federal Procurement Data System (Federal)

  • Coarse Aggregate Material Purchase and Delivery for Buck Lake Conservation Area in Brevard County

    Type : Bid Notification

    Due : 02 May, 2024 (in 6 days)
    Posted : 28 days ago
    Started : 28 Mar, 2024 (28 days ago)

    The District anticipates purchasing 2,500 tons of coarse aggregate to construct low water crossings.

    From: St. Johns River Water Management District (Other)

  • Y--SAGEBRUSH DISCOVERY TRAIL DESIGN/BUILD, NV

    Type : Pre-Bid Notification

    Due : 10 May, 2024 (in 13 days)
    Posted : 6 hours ago
    Started : 25 Apr, 2024 (Yesterday)

    Key project elements include the following: · 1.25 miles of natural surface trail, · one approximately 35-foot bridge with abutments and egress ramps · three hardened seasonal low water crossings · one shade structure with picnic table mid-trail, interpretive signs along trail · access roads from highway to North Trailhead · Two trail-head parking areas (North and South) each containing a key entrance sign and informational kiosk, welded steel post

    From: Federal Government (Federal)

  • Town of Diamond Valley - Sheep River Waterline Crossing

    Type : Bid Notification

    Due : 06 May, 2024 (in 9 days)
    Posted : 7 days ago
    Started : 03 Apr, 2024 (22 days ago)

    The main items of Work of this Contract include the following:Installation of 400m 250mm diameter waterline across the Sheep River by directional drilling methods.Connection of 250mm Waterline to existing Chlorination building and construction of new lean to structure.Replacement of 150mm PRV Valve.The Site of the Work of this Contract is located in Diamond Valley, Alberta. Bid Document Access : - Bid document preview, bid opportunity, and award notices are available on the site free of charge. Suppliers are not required to register for a bid opportunity prior to previewing unsecured bid documents. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. To obtain an uns...

    From: MPE Engineering Ltd (Co-op)