Type : Bid Notification
CP2020-003 Reissued Magruder Lower Level Flooring Project Thursday, October 24, 2019 @ 2:00 PM CDT Kim Murphy
CP2020-003 Reissued Magruder Lower Level Flooring Project Thursday, October 24, 2019 @ 2:00 PM CDT Kim Murphy
INVITATION TO BIDCITY OF DES PERESTHE LODGE LOWER LEVEL FLOORING RESURFACING The City of Des Peres is soliciting bids from qualified vendors to demo/remove existing epoxy flooring and base, ceramic tile that epoxy flooring is over and the mortar bed underneath the tile.
Flooring - Install New, Remove Old, Shepard Lower Level postdate:- 05/10/2023 responsedate:- 05/23/2023 02:00 PM EDT Solicitation Number:- Locked Registered members only to solicitation details & future business opportunities.
Statewide Flooring (BPM006170) - Lot : 1 / Round : 2 Organization:-Arizona Department of AdministrationSee AllDelete the value. Procurement Officer Phone:-602-542-0433 SummaryThe purpose of this Solicitation is to establish the State’s Floor Covering including all labor, equipment and materials necessary to install carpet and flooring materials in designated areas Program for Eligible Agencies, Employees, and the State of Arizona.
The existing basketball courts will be renovated with new flooring and equipment. The lower level will provide a complete sports medicine area with treatment and recovery areas including hydrotherapy pools. It will also include new locker rooms, player lounges, team meeting rooms, and other team amenities.
Bolts to be taken down to flooring level and holes filled if lower that floor level. Approx. 44 shelving units in total. Phase 3) Move two (2) caged areas and staged them within the RIC warehouse. Area 1 (Facilities cage) is approx. 3500 square feet and area 2 (IT cage) is approx. 1100 square feet. Contractor to supply bins/speed packs/pallets used to move smaller items. Cage product to be staged for approx. 2- 3 weeks.
Bolts to be taken down to flooring level and holes filled if lower that floor level. Approx. 44 shelving units in total. Phase 3) Move two (2) caged areas and staged them within the RIC warehouse. Area 1 (Facilities cage) is approx. 3500 square feet and area 2 (IT cage) is approx. 1100 square feet. Contractor to supply bins/speed packs/pallets used to move smaller items. Cage product to be staged for approx. 2- 3 weeks.