The design has progressed to 60% and we are pursuing GMP pricing for the Stage #4 scope of work based on this current design along with industry/trade practices and all applicable codes. Stage #4 Construction is anticipated to begin in the third quarter of 2023 with a duration of approximately 31 months. Stage#4 estimate timeline:
The project scope of work at the Amite County Elementary School is funded by district funds. The work will include paving and drainage upgrades and the installation of a guardhouse and fencing as indicated in the construction documents.
Contract Opportunity General Information Classification Description Attachments/Links Contact Information History Award Notices Follow 66--Portable Optically Stimulated Luminescence IAW SOW Active Contract Opportunity Notice ID 140G0122Q0156 Related Notice Department/Ind. Agency INTERIOR, DEPARTMENT OF THE Sub-tier US GEOLOGICAL SURVEY Office OFC OF ACQUSITION GRANTS-NATIONAL Looking for contract opportunity help?
Portable Optically Stimulated Luminescence (OSL) Reader System In Accordance With Attached Statement of Work The U.S. Geological Survey has a requirement for A Portable Optically Stimulated Luminescence (OSL) Reader System In Accordance with the Attached Statement of Work to be delivered to the US Geological Survey, Denver, CO 80225, not later than 120 Days After Receipt of Order.
work in accordance with the Contract Documents.
Comments: Please see attached scope of work Special Terms and Conditions: none Header AttachmentseVA Quick Quote Standard Term and Condition.pdf (7.05 KB) Arlington County.pdf (427.41 KB) Survey GNSS Scope of Work.docx (66.97 KB) Line AttachmentsThere are no line item attachmentsHeader AttachmentsAttachmentSizeeVA Quick Quote Standard Term and Condition.pdf(7.05 KB)Arlington County.pdf(427.41 KB)Survey GNSS Scope of Work.docx(66.97 KB)Line AttachmentsThere
Email Address: administrator@stantontx.net Phone: 432-756-3301 Fax: 432-756-2083 Scope of Work A. The scope of the project is generally described as interior finish-out of an existing 2,500 sq.ft. maintenance storage building.
Bid Title:Request for Quotes Park and Recreation Scope of Work Category:BidsStatus:Open Description: City of Framingham soliciting quotes for removal of existing lighting fixtures and installation of new LED lighting fixtures, provided by others, at Loring Ice Arena. This is a request for quotes. The contract will be awarded to the lowest and responsive vendor.
If a Vendor is unclear about a requirement or specification or believes a change to a requirement would allow for the State to receive a better proposal, the Vendor is urged to submit these items in the form of a question during the question-and-answer period in accordance with the Proposal Questions Section above. 4.1 PRICING Proposal price shall constitute the total cost to the State for complete performance in accordance with the requirements and