Search results for: machinery and controls

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 7,809
  • DALE HOLLOW SPILLWAY GATE RECOATING AND <b>MACHINERY</b> <b>CONTROLS</b> REHAB - ADMINISTRATIVE NTP

    DALE HOLLOW SPILLWAY GATE RECOATING AND MACHINERY CONTROLS REHAB - ADMINISTRATIVE NTP

    Type : Contract

    Due : 06 Mar, 2025 (in 10 months)
    Posted : 3 months ago
    Started : 30 Mar, 2024 (1 month ago)

    DALE HOLLOW SPILLWAY GATE RECOATING AND MACHINERY CONTROLS REHAB - ADMINISTRATIVE NTP Solicitation ID/Procurement Identifier: W912P522R0006 Ultimate Completion Date: Thu Mar 06 18:00:00 GMT 2025

    From: Federal Procurement Data System (Federal)

  • Small Lock Machinery and Controls Replacement (SLMCR) Lake Washington Ship Canal (LWSC), WA

    Type : Bid Notification

    Due : 08 Apr, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 21 Mar, 2022 (about 2 years ago)

    The purpose of the project is to remove and dispose of the existing machinery and controls that operate the miter gates, valves, and controls system, increase the size of the exiting machinery recesses, and install the compact hydraulic machinery, reconnect to the existing gates, and install the necessary electrical components to connect to the master PLC and Remote I/O Panels.In Water Work.

    From: Federal Government (Federal)

  • J--PISCES Machinery Control System (MCS) Modifications

    Type : Bid Notification

    Due : 21 Dec, 2023 (4 months ago)
    Posted : 4 months ago
    Started : 07 Dec, 2023 (4 months ago)

    The machinery control system was designed and installed by The GBS Group under contract number 1305M221PNMAN0353. To maintain the warranty, the OEM must complete all modifications and grooming.

    From: Federal Government (Federal)

  • Modernization and Obsolescence Machinery Control Systems Support

    Type : Bid Notification

    Due : 10 Aug, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 26 Jul, 2018 (about 5 years ago)

    NSWCPD has a requirement for all activities associated with DDG-51 FLTI (Flight), FLTII, FLTIIA (Legacy, Modernization and New Ship Construction), FLTIII & HED (Hybrid Electric Drive), Modernization and Obsolescence Machinery Control Systems (MCS), Damage/Casualty control Plotting Systems, Fuel Control Systems (FCS) and Integrated Bridge Control system, computer program development, testing, equipment harvesting, and installation for ship construction

    From: Federal Government (Federal)

  • Modernization and Obsolescence Machinery Control Systems Support

    Type : Pre-Bid Notification

    Due : 16 Apr, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 02 Apr, 2019 (about 5 years ago)

    DDG-51 Integrated Bridge Controls (IBS) Systems provide a means of automating the collection, processing, and bridge watch stander's efficiency and navigational safety.  Integrated Bridge Controls systems implement ship control Algorithms to reliable control steering Machinery Control System and Fuel Control System (FCS) computer programs Shipboard and at LBES. 

    From: Federal Government (Federal)

  • Human Machine Interface (HMI) Equipment

    Type : Bid Notification

    Due : 07 May, 2024 (in 2 days)
    Posted : 1 month ago
    Started : 30 Apr, 2024 (4 days ago)

    This requirement is for NSWCPD Code 516, which is responsible for machinery controls engineering support and advanced damage control systems support.The requirement is in support of a contract for Propulsion Auxiliary Control, Damage Control, Ballast Control, and various machinery control Human-Machined Interfaces (HMI). These HMIs shall be used on U.S. Naval Ships, Military Sealift Command, Army, U.S.

    From: Federal Government (Federal)

  • Replacement of head gate machinery, wiring, controls and machinery huts at the following three dams: Wolf Creek, Center Hill, and Dale Holl...

    Type : Bid Notification

    Due : 19 Jun, 2018 (about 5 years ago)
    Posted : about 6 years ago
    Started : 01 Jun, 2018 (about 6 years ago)

    PROJECT DESCRIPTION: This contract will be for the replacement of all head gate machinery, wiring, controls and machinery huts at the following three dams: Wolf Creek, Center Hill, and Dale Hollow. This description is not intended to be all encompassing and is subject to change. SOLICITATION AND CONTRACT TYPE: It is anticipated that from the IFB solicitation, the Government will award one Firm-Fixed Price (FFP) Commercial Supply Contract.

    From: Federal Government (Federal)