Type : Bid Notification
2024 Water Main Improvements Contract 1 Return Date: 5/7/2024 11:00:00 AM
2024 Water Main Improvements Contract 1 Return Date: 5/7/2024 11:00:00 AM
at 10:00 a.m. local time for the GEORGE STREET WATER MAIN IMPROVEMENTS.
The proposed work is officially known as “George Street Water Main Improvements” and further described as installation of new water main, water services, valve in vaults, and fire hydrants, cured in place pipe lining of sanitary sewer, pavement patching, restoration of parkways, PCC and HMA driveway apron removal and replacement, and epoxy manhole lining all as further described in the contract documents for the said work prepared by Christopher B
Indianapolis, IN Water Main Improvements Project Information 4/2/20 Midwest Mole, Inc. Phone: 317-545-1335 Fax: 317-545-1558 Ryan Barkdull Email: rbarkdull@midwestmole.com Amy Webster Email: plandesk@midwestmole.com
2017 Water Main Improvements April 17, 2017 May 3, 2017
BID 24-05-0-2024/jjg CLOSED 02/29/2024 04/02/2024 Bid 24-05 2024 Water Main Improvements BID 24-05 Tabulation BID 24-05 Addendum #2 BID 24-05 Addendum #1
Water Main Improvements Organization:Town of Salisbury Department:TOSB01 - Town of Salisbury Location:TOS01 - Town Hall Bulletin Desc:Proposed Water Main Improvements for Adams Street, Garfield Street & Taft Street in Salisbury MA consists of the removal and replacement of the existing, substandard 6-inch water main and replacement with approximately 1,030 LF of new 8-inch ductile iron water main and related water services to 23 residential dwellings