  • RCC 930N Main Machinery Room

    Type : Award

    Due : 12 Dec, 2022 (15 months ago)
    Posted : 22 months ago
    Started : 31 May, 2022 (22 months ago)

    BAE-NSR will be tasked to replace ventilation ducting for Main Machinery Room One (MMR 1). During moisture separator installation, the contractor discovered severe corrosion to MMR 1 ventilation systems to the point that sections of the ducting had fallen down the trunk. The skin of the ship and structural supports to the intake air are exposed to the outside environment.

    From: Federal Government (Federal)

  • BALL VALVE

    Type : Pre-Bid Notification

    Due : 30 Jan, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 22 Jan, 2018 (about 6 years ago)

    Intended use: potable hot and cold water service in Main Machinery Room #1CLIN 0002:  BALL VALVE, QTY 2P/N M311-4J-01, BALL, 400 PSI, BRONZE BODY, 4 NPS, SWLDG END PIECES, W/TITANIUM BALL PER DWG 803-5001004 Salient Characteristics:  a. Ball Valve, 4" NPSb. Bronze valve body with titanium ballc. Electrical data is NOT ACCEPTABLEd. 400 PSI, IAW Navy Standard DWG. 803-5001004 for 4" NPS valves, with socket welded end piecese.

    From: Federal Government (Federal)

  • USCGC ALDER <b>Main</b> Diesel Engines, Mount Renewal

    USCGC ALDER Main Diesel Engines, Mount Renewal

    Type : Bid Notification

    Due : 28 Mar, 2024 (Today)
    Posted : 14 days ago
    Started : 13 Mar, 2024 (15 days ago)

    on on main engine resilient mount installa?on. 3.2.1 The intent of this item is to renew the engine mounts and then realign engine to reduc?on gear on both MDEs. CG Dwg 225B-WLB 233-001 shows the MDE installa?on onboard the vessel. Atached Figure 1, “Photos of Current MDE mounts” illustrate the installed mounts. 3.2.2 The concerned work area is the Main Machinery Room (4-66-0-E). 3.2.3 The MDE mounts are manufactured by Chris?

    From: Federal Government (Federal)

  • USCGC BERTHOLF (WMSL-750) SSDG Major Overhaul DS FY19 FQ4

    Type : Bid Notification

    Due : 15 Feb, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 30 Jan, 2019 (about 5 years ago)

    DESCRIPTION        LOCATION3512B No.1 Ship Service Diesel Generator,1360 KW, 450 Volt AC, 3 Phase, 60 Hz Auxiliary Main Machinery Room (5-36-01-E)3512B No.2 Ship Service Diesel Generator,1360 KW, 450 Volt AC, 3 Phase, 60 Hz Forward Main Machinery RoomThe contractor shall provide the services of a certified Technical Representative, who is familiar with the Original Equipment Manufacturer (OEM), Caterpillar Inc.

    From: Federal Government (Federal)

  • USS O'KANE, Repair of Fuel Oil Pipe

    Type : Bid Notification

    Due : 25 Feb, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 20 Feb, 2019 (about 5 years ago)

    Southwest Regional Maintenance Center (SWRMC) Code 450 DDG intends to award a Sole Source new work change order to Huntington Ingalls Industries, San Diego Ship Yard (HII SDSY) to repair the fuel oil piping in the Main Machinery Room No. One in support of  Contract N00024-19-C-4406 for USS O’KANE (DDG 77) Fiscal Year 2019 Extended Selected Restricted Availability (ESRA). 

    From: Federal Government (Federal)

  • CGC WAESCHE

    Type : Bid Notification

    Due : 20 May, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 13 May, 2019 (about 4 years ago)

    Aft Main Machinery Room (AMMR) MPDE No2 S/W Inlet Pressure Gauge Root Valve. 3/4 IPS 1 15-52-0-E. Aft Main Machinery Room (AMMR) MPDE No2 S/W Plate cooler Inlet 6 IPS 1 2 3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work.

    From: Federal Government (Federal)

  • cgc james NR2 SSDG Exhaust Inspect, Repair, Cleaning, Renew Lagging

    Type : Bid Notification

    Due : 28 Mar, 2023 (12 months ago)
    Posted : 12 months ago
    Started : 24 Mar, 2023 (12 months ago)

    This work item describes the requirements for the Contractor to clean the Ship Service Diesel Generator (SSDG) exhaust piping (including the associated stack uptakes) and renew all exhaust piping insulation for the SSDG listed in Table 1.Table 1 – List of ssdg(s)EQUIPMENTLOCATIONShip Service Diesel Generator No. 2Fwd Main Machinery Room (5-44-01-E)1.2 Government-furnished property.APM: Validate all GFP data.

    From: Federal Government (Federal)