Type : Award
BAE-NSR will be tasked to replace ventilation ducting for Main Machinery Room One (MMR 1). During moisture separator installation, the contractor discovered severe corrosion to MMR 1 ventilation systems to the point that sections of the ducting had fallen down the trunk. The skin of the ship and structural supports to the intake air are exposed to the outside environment.