Search results for: main street corridor

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 134
  • SW District, City of Maryville, Phase II, Reconstruction of approximately 0.7-mile section of South Main Street Corridor from State Highway...

    Type : Bid Notification

    Due : 14 May, 2024 (in 10 days)
    Posted : 19 days ago
    Started : 11 Apr, 2024 (22 days ago)

    Bids shall be submitted in a sealed envelope marked “Bid for “South Main Improvement Phase II & Pedestrian Enhancement, STP-4301104 & TAP- 4301106, Maryville, Missouri”. Bids received after the designated closing time will be returned unopened. The proposed work includes: Reconstruction of approximately 0.7-mile section of South Main Street Corridor from State Highway V to 285th Street.

    From: Missouri Department of Transportation (Transportation)

  • Main Street Corridor Study

    Type : Bid Notification

    Due : 11 Apr, 2023 (12 months ago)
    Posted : 13 months ago
    Started : 03 Mar, 2023 (14 months ago)

    Main Street Corridor Study Bid No.2023-03-11 The Village of Skokie is seeking the services of a qualified Consultant to conduct a study of the Main St. Commercial Corridor and make recommendations for improvements. Status: Closes: Open 4/11/2023 3:00 PM

    From: Skokie (Village)

  • 2022-090 Main Street Corridor Preemption Installations

    Type : Bid Notification

    Due : 13 Dec, 2022 (16 months ago)
    Posted : 17 months ago
    Started : 10 Nov, 2022 (18 months ago)

    Related Documents: 2022-090 - Main St Corridor Preemption Install Plan Holders 2022-090 - Main St Corridor Preemption Install Specs2022-090 - Main Street Corrodor Addendum No.12022-090 - Main Street Corridor Pre-bid Meeting Minutes and Addendum No.2.pdf

    From: Lewiston Maine (City)

  • Main Street Corridor Improvement Project

    Type : Bid Notification

    Due : 19 Mar, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 27 Feb, 2019 (about 5 years ago)

    Bids shall cover the following: Main Street Corridor Improvement Project Bid Number: 19-05 Work on this project includes traffic signal modernization and fiber interconnection of an existing signal at McDaniel Street and a new signal at the East Access Drive.

    From: Evanston (City)

  • 23-001 Professional Engineering Services for West Main Street Corridor Improvements

    Type : Bid Notification

    Due : 08 Dec, 2022 (17 months ago)
    Posted : 18 months ago
    Started : 17 Oct, 2022 (18 months ago)

    Design services for the West Main Street Corridor Improvements for the City of Pensacola is identified in the City’s Local Agency Participation contract with the Florida Department of Transportation (FDOT). Consideration will be given to only those firms that are pursuant to law and that have been prequalified by FDOT to perform Work Type 3.1 Minor Highway Design.

    From: Pensacola (City)

  • Town of Fortville Main Street Corridor Improvement Project.

    Type : Bid Notification

    Due : 19 Feb, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 17 Jan, 2019 (about 5 years ago)

    The project will include pedestrian crosswalks with high visibility markings (continental, zebra, or ladder) at Pearl Street, Mill Street, Maple Street, and Noel Street on both sides of Main Street, as well as similar crosswalks across Main Street at these same locations. The project will include pedestrian-scaled safety lighting with public sound system, pedestrian signage, and at least 4 pedestrian resting areas (benches).

    From: Indiana Department of Transportation (Transportation)

  • SW District, City of Maryville, Phase II, Reconstruction of approximately 0.7-mile section of South Main Street Corridor from State Highway...

    Type : Bid Notification

    Due : 14 May, 2024 (in 11 days)
    Posted : 7 days ago
    Started : 11 Apr, 2024 (21 days ago)

    \n\nThe proposed work includes: Reconstruction of approximately 0.7-mile section of South M ain Street Corridor\nfrom State Highway V to 285\" Street. The work consists of storm sewer system improvement, full depth street\nwidening, mill and overlay, traffic signals, lighting, sidewalk, landscaping, and improvement to existing driveway\naccesses.

    From: Department of Transportation (Transportation)