Search results for: main tie breaker

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 37
  • REPLACEMENT OF MAIN TIE BREAKER AT THE CLAYTON COU

    Type : Bid Notification

    Due : 28 Sep, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 25 Aug, 2021 (about 2 years ago)

    Buyer Contact: Krystal Ashley centralservicesbis@claytoncountyga.gov 7704773587 Description: Invitation to Bid: This Invitation to Bid (ITB) is for qualified Bidders (“Bidder” or “Bidders”) to provide a Replacement of the Main Tie Breaker for Clayton County Justice Center for the Clayton County.

    From: Georgia (State)

  • Defense Supply Center Richmond - Building 46 SWITCH GEAR CONTROLS

    Type : Bid Notification

    Due : 06 Feb, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 14 Jan, 2020 (about 4 years ago)

    NOTE:  CONTRACTOR SHALL BE A CERTIFIED EATON SWITCHGEAR REPAIR COMPANY.Install automatic breaker controls so main breakers will close automatically after a power outage. See shop drawing for details. The installed system will monitor the utility voltage, main circuit breakers and tie circuit breaker status, and main circuit breakers and tie circuit breaker current trip switches.

    From: Federal Government (Federal)

  • 59--Electrical Upgrades Project (Medium and Low Voltage Switchgear) at the U.S. EPA

    Type : Bid Notification

    Due : 06 Sep, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 22 Aug, 2018 (about 5 years ago)

    Electric, or approved equal) in preparation for the replacement of each main breaker and each bus tie breaker.

    From: Federal Government (Federal)

  • Sources Sought 15kV Switchgear & Station Service Replacement at Lake Tenkiller, OK

    Type : Bid Notification

    Due : 02 Nov, 2023 (5 months ago)
    Posted : 6 months ago
    Started : 03 Oct, 2023 (6 months ago)

    .• Automatic transfer functionality for the 480V switchgear main & tie breakers, along with local arcflash mitigation switches.• Replacement and relocation of existing Lighting Transformer

    From: Federal Government (Federal)

  • Chief Joseph Dam 480V Station Service Upgrade

    Type : Bid Notification

    Due : 07 Mar, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 25 Feb, 2022 (about 2 years ago)

    The new equipment will include modern circuit breakers and improved personnel safety risks. A new SCADA system will enable operation of power circuit breakers and status monitoring (open, closed, trip) of main and tie breakers for SU1-SU4 from the Control Room HMI. Local control panels will provide the similar functionality for all power circuit breakers at the switchgear/MCCs, but outside of the defined arc flash boundary.

    From: Federal Government (Federal)

  • Z1DA--FY21: NRM - Tier 2 (PROJ: 673-20-104) DB - Incorporate / Integrate Double-Ended Switchgear for Building 38

    Type : Bid Notification

    Due : 15 Jul, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 14 Jul, 2021 (about 2 years ago)

    PROJECT TITLE: Design Build Incorporate/Integrate Double Ended Switchgear for Building 38 LOCATION: James A Haley Medical Center, Tampa, FL PROJECT SUMMARY: Provide all labor, materials, tools and equipment, and design-build services necessary to incorporate into the existing Building 38 Electrical Switchgear a new Secondary Substation Transformer, Main Switchboard and Tie Breaker. The project is located at the James A Haley Medical Clinic.

    From: Federal Government (Federal)

  • Z1DA--FY21: NRM - Tier 2 (PROJ: 673-20-104) DB - Incorporate / Integrate Double-Ended Switchgear for Building 38

    Type : Pre-Bid Notification

    Due : 15 Jul, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 15 Jun, 2021 (about 2 years ago)

    PROJECT TITLE: Design Build Incorporate/Integrate Double Ended Switchgear for Building 38 LOCATION: James A Haley Medical Center, Tampa, FL PROJECT SUMMARY: Provide all labor, materials, tools and equipment, and design-build services necessary to incorporate into the existing Building 38 Electrical Switchgear a new Secondary Substation Transformer, Main Switchboard and Tie Breaker. The project is located at the James A Haley Medical Clinic.

    From: Federal Government (Federal)