Search results for: make ready and drop

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 102
  • Construction, Make Ready and Drop Installation

    Type : Bid Notification

    Due : 13 Jan, 2023 (15 months ago)
    Posted : 17 months ago
    Started : 02 Dec, 2022 (17 months ago)

    This will include but is not limited to Outside Plant, Inside Plant, splicing, Customer Premises Equipment (CPE) as well as One Touch Make Ready (OTMR), both simple and complex, in the telecommunication space. The scope of work includes 533 miles of designed network ready for construction over the next 3 years. The architecture of the network is a Passive Optical Network (PON) designed around Fiber Service Areas (FSAs) and Backbone Routes.

    From: Vermont (State)

  • Stainless Steel Refrigerated Salad Bar

    Type : Bid Notification

    Due : 07 Oct, 2022 (18 months ago)
    Posted : 18 months ago
    Started : 26 Sep, 2022 (19 months ago)

    Order drop ins recommended by ACF. 3. Deliver and fully install the unit. 4. Make ready for final electrical connections. 5. Check all utilities and measurements before placing order with the factory. 6.

    From: Georgia (State)

  • Lift Station 2 (LS2) and Lift Station 3 (LS3) Improvements

    Type : Bid Notification

    Due : 05 Oct, 2023 (6 months ago)
    Posted : 8 months ago
    Started : 10 Aug, 2023 (8 months ago)

    . #: ITB# 2022/2023-A16 Type: ITB Status: Open Open Date: Aug 10th 2023, 5:00 PM EDT Questions Due Date: Sep 12th 2023, 5:00 PM EDT Close Date: Oct 5th 2023, 2:00 PM EDT Days Left: < 1 Project Description:LS2 IMPROVEMENTS (PART A) The Selected Contractor shall perform the Work complete, in place and make ready for construction of a complete rehabilitation of the existing Clay County Utility Authority (CCUA) Lift Station 2 (LS2) duplex pump station

    From: Clay County Utility Authority (Utilities)

  • DESIGN, FURNISH, INSTALL AND MAINTAIN HIGH- SPEED FIBER OPTIC INTERNET SERVICE TO UNSERVED AREAS OF GREENE COUNTY

    Type : Bid Notification

    Due : 13 Jul, 2022 (21 months ago)
    Posted : 21 months ago
    Started : 28 Jun, 2022 (22 months ago)

    However, high-speed broadband service is not available everywhere in Greene County due to the high costs associated with construction and in many cases a low number of households per mile in rural areas. These hurdles can include low-density development, rights-of-way restrictions, underground construction, make-ready work for pole replacement and licensing, and topography.

    From: Greene (County)

  • 6515--580-20-3-5167-0059 NFS Roll In Oven (VA-20-00067517)

    Type : Bid Notification

    Due : 24 Jun, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 19 Jun, 2020 (about 3 years ago)

    Receive, inspect, uncrate, deliver, set in place, level, hook up to existing utilities per the factory specifications, seal all penetrations around connections, start up, test, and make ready for final use, perform quality check, and remove all installation debris. Equipment to deliver to the jobsite prior to installation date. Work to be completed after 2:00 PM. No alterations to existing building structure will be made by the government.

    From: Federal Government (Federal)

  • IFB for Installation Contract for FTTP Services

    Type : Bid Notification

    Due : 10 Apr, 2024 (18 days ago)
    Posted : 1 month ago
    Started : 26 Mar, 2024 (1 month ago)

    Contractor will be responsible for uploading to SHELD field photos and make-ready documents to SHELD of all installed equipment and pathway. 12 | P a g e OUTDOOR INSTALLATION WORK SUMMARY AND PROCESS 1. Connect the drop-fiber cable into the MST designated for that service location. Aerial drop fiber shall be securely fastened and supported on the strand and pole. 2.

    From: South Hadley Electric Light Department (Other)

  • 7320--Healthy Teaching Kitchen Equipment

    Type : Bid Notification

    Due : 14 Jul, 2023 (9 months ago)
    Posted : 10 months ago
    Started : 10 Jul, 2023 (9 months ago)

    electric, water and drains Test and certify fire systems on the ventless ranges Remove debris, confirm operation of all equip, clean and make ready for final use

    From: Federal Government (Federal)